☎ (888) 264-7050
Kansas Environmental Reporting Calendar: The KDHE Deadlines a Federal List Misses

Kansas Environmental Reporting Calendar: The KDHE Deadlines a Federal List Misses

The Kansas-specific KDHE deadlines, fees, and portals a federal EPA calendar does not include, from the KSQG tier to Tier II, hazardous waste, and air permits.

If you already run a federal EPA and OSHA compliance calendar, you have the Tier II date, the TRI date, and the RCRA Biennial Report cycle covered. What that federal calendar does not have is the Kansas layer sitting on top of it: a state annual hazardous waste report with its own fee, a state Tier II fee and portal, a state Form R fee, a Kansas-only air permit tier, and per-tank fees that attach whether or not an inspector ever shows up. The Kansas Department of Health and Environment (KDHE) runs that layer, and this calendar covers it specifically, for Kansas facilities, with the citation behind every date.

Which Agency Runs Environmental Reporting in Kansas?

Almost every environmental filing a Kansas facility owes goes to KDHE’s Division of Environment, split across four bureaus: the Bureau of Waste Management (hazardous and solid waste, storage tanks), the Bureau of Air (Class I and Class II operating permits, emissions inventory), the Bureau of Water (NPDES, stormwater, public water supply), and the Right-to-Know Program, which serves as the Kansas State Emergency Response Commission for Tier II and Form R.

Kansas holds delegated or authorized status for the three big federal program areas, and that delegation is exactly what makes a Kansas calendar different from a federal one. Kansas received final authorization for its base hazardous waste program on October 17, 1985 (50 FR 40377), with program revisions authorized in 1990, 1994, 1996, and 2013 (78 FR 43810). KDHE has administered the base NPDES program since June 28, 1974, federal facilities since 1985, and general permits since November 24, 1995, but Kansas is not authorized for pretreatment or biosolids; EPA Region 7 retains both (EPA NPDES State Program Profile, Kansas). Air permitting runs under Kansas’s own regulations at K.A.R. article 28-19, with a two-tier structure: Class I for Title V sources and Class II, a Kansas-only intermediate tier with no federal equivalent (K.A.R. 28-19-517, K.A.R. 28-19-546).

One structural fact drives most of this calendar: Kansas layers an annual hazardous waste report and an annual monitoring fee on top of the federal biennial report, and EPA has stated in the Federal Register that these Kansas annual report and fee provisions are “broader in scope” than the federal program and therefore not federally enforceable. They exist only under Kansas law, which is exactly why a federal-only calendar will not show them. A clean EPA inspection says nothing about whether a facility’s Kansas annual reports are current, because these are KDHE-only obligations (78 FR 43810).

What Is a Kansas Small Quantity Generator, and Why Does Federal RCRA Have No Equivalent?

Picture a 40-employee machine shop running coolant, solvent wipes, and parts washer waste. Most months it generates about 40 kilograms of hazardous waste. Under federal RCRA, that volume sits below the 100 kg very small quantity generator (VSQG) line, so the shop has essentially no federal annual filing. In Kansas, the same 40 kilograms puts the shop in a category federal rules do not have at all.

K.A.R. 28-31-260a(a)(8) defines a Kansas small quantity generator (KSQG) as a site generating 25 kilograms (55 pounds) or more, but no more than 100 kilograms (220 pounds), per calendar month. Kansas also sets its conditionally exempt tier lower than the federal VSQG line: under 25 kg per month in Kansas, versus under 100 kg federally. The practical result is a four-tier Kansas structure (CESQG, KSQG, SQG, LQG) layered over the federal three-tier structure (VSQG, SQG, LQG), and the KSQG tier is the one most facilities never budget for, because their federal status tells them they owe nothing.

A Kansas KSQG owes an annual report and a $150 monitoring fee, due on or before April 1 (K.A.R. 28-31-262a(b), K.A.R. 28-31-10). EPA identified the KSQG waste minimization certification at K.A.R. 28-31-262a(e)(1) as more stringent than the federal program when it reviewed Kansas’s authorization (78 FR 43810). Count your monthly hazardous waste generation against the Kansas 25 kg line before you assume a filing does not apply to your site. The federal 100 kg VSQG threshold has no bearing on Kansas status.

Has Kansas Adopted the Federal Hazardous Waste Generator Improvements Rule?

No. EPA’s own adoption tracker, last updated October 8, 2026, lists Kansas as “No” for both adopted and authorized on the 2016 Hazardous Waste Generator Improvements Rule (EPA, Where Is the Hazardous Waste Generator Improvements Rule in Effect?). Kansas regulations still adopt 40 CFR part 261 as it stood on July 1, 2006, which is why Kansas uses “conditionally exempt small quantity generator” rather than VSQG and still runs pre-2016 generator mechanics. Kansas has also not adopted RCRA Subpart K, Subpart P, or the 2008 and 2015 Definition of Solid Waste rules (KDHE 2025 Hazardous Waste Report Instructions).

This is worth saying plainly, because it runs the opposite direction from how most state calendars get framed. Kansas sits behind the federal generator baseline. We cover the full federal VSQG, SQG, and LQG framework, including the Generator Improvements Rule’s category mechanics and its two voluntary flexibility programs, in our post on hazardous waste generator categories. That post also carries the Kansas caveat directly: because Kansas never adopted the rule, neither of its flexibility programs, episodic generation under Part 262 Subpart L, nor VSQG consolidation at a commonly controlled LQG, exists for a Kansas site, in state or across a state line. Read that post for the federal generator framework, then come back here for the Kansas reporting dates layered on top of it.

Does Kansas Require a Hazardous Waste Report in Years the Federal Biennial Report Is Not Due?

Yes, Kansas requires the annual report every single year. K.A.R. 28-31-262a(b) requires every generator other than a CESQG to report its generator status and prior-year quantities. Large quantity generators (LQGs) report on or before March 1 in each year the federal biennial report is not required. SQGs and KSQGs report on or before April 1 every year, biennial cycle or not.

2027 is an odd year, so the federal RCRA Biennial Report is not due. Kansas LQGs still owe the Kansas annual hazardous waste report on Monday, March 1, 2027, filed with the Monitoring Fee (MF) Form. In 2028, an even year, the federal Biennial Report and the Kansas MF Form and fee become a single complete submission, due Wednesday, March 1, 2028. Put the Kansas annual report on your calendar for every single year, and track which year’s filing is standalone versus combined with the federal report.

The Full Kansas Environmental Reporting Calendar

The table below carries the recurring Kansas deadlines with 2027 weekdays verified against the calendar.

Due DateFilingWho FilesAgencyCitation
Before Jan 1, 2027TSDF annual facility monitoring fee, $10,000 to $18,000 by activity typeStorage, treatment, landfill, and underground injection facilitiesKDHE Bureau of Waste ManagementK.A.R. 28-31-10
Before Jan 1, 2027Hazardous waste transporter annual fee, $200Registered hazardous waste transportersKDHE Bureau of Waste ManagementK.A.R. 28-31-10
Mon, Mar 1, 2027Kansas Tier II filing, state fee, certification letter, and fee worksheetFacilities over EPCRA 312 thresholds in KansasKDHE Right-to-Know Program (Kansas SERC)Kansas Tier II Online Reporting System; fee schedule at K.A.R. 28-65-4
Mon, Mar 1, 2027Kansas LQG annual hazardous waste report, filed with the MF FormLarge quantity generatorsKDHE Bureau of Waste Management, via KEIMSK.A.R. 28-31-262a(b)
Mon, Mar 1, 2027LQG monitoring fee, $300 to $8,000 by prior-year tonnageLarge quantity generatorsKDHE Bureau of Waste ManagementK.A.R. 28-31-10
Thu, Apr 1, 2027Kansas annual emissions inventory via SLEIS, plus annual emissions feeClass I and Class II operating permit sourcesKDHE Bureau of AirK.A.R. 28-19-517, K.A.R. 28-19-546
Thu, Apr 1, 2027SQG and KSQG annual hazardous waste report plus $150 monitoring feeSmall quantity generators and Kansas small quantity generatorsKDHE Bureau of Waste ManagementK.A.R. 28-31-262a(b), K.A.R. 28-31-10
Fri, Apr 30, 2027UST annual operating permit fee, $25 per tankOwners and operators of regulated USTsKDHE Storage Tank Section, via KEIMSK.A.R. 28-44-17
Thu, Jul 1, 2027Kansas Form R state fee, $250 to $3,000, submitted with the federal Form RTRI reporters in KansasKDHE Right-to-Know ProgramK.A.R. 28-65-4(b)
Thu, Jul 1, 2027Consumer Confidence Report to customers, plus Certificate of Delivery and CCR copy to KDHEPublic water systems, including plants with their own systemKDHE Bureau of WaterKDHE Consumer Confidence Reports
Fri, Dec 31, 2027AST annual registration and operating permit fee, $10 per tankOwners of regulated aboveground storage tanksKDHE Storage Tank SectionK.A.R. 28-44-29
Floats on permit anniversaryIndustrial stormwater annual permit fee, $60Permittees under Kansas general permit S-ISWAKDHE Bureau of Water, via KEIMSKDHE S-ISWA Industrial Stormwater General Permit Fact Sheet
Floats 6 to 18 months before permit expiryClass I operating permit renewal applicationClass I (Title V) sourcesKDHE Bureau of AirK.A.R. 28-19-514
Floats per SWP2 planAnnual comprehensive site compliance evaluation, submitted through KEIMSIndustrial stormwater permitteesKDHE Bureau of WaterKDHE S-ISWA Fact Sheet

The federal dates that intersect this table, March 1 for Tier II and the biennial report cycle, appear here only as the hook for the Kansas-specific fee, portal, or companion filing. For the federal Tier II mechanics themselves, applicability, and thresholds, see our EHS compliance calendar and Tier II reporting deadline guide.

Which Portal Handles Which Kansas Filing?

Three Kansas systems have no federal analogue, and a facility that assumes one login covers all of them will miss a filing. KEIMS (Kansas Environmental Information Management System) handles storage tank permits, stormwater coverage, and the hazardous waste Monitoring Fee Form (KDHE S-ISWA Fact Sheet). SLEIS handles the air emissions inventory (KDHE Emissions Inventory). The Kansas Tier II Online Reporting System at tier2online.kdhe.ks.gov handles Tier II, and it is a separate system from federal Tier2 Submit.

The federal RCRA Biennial Report itself still runs through EPA’s RCRAInfo system. That means in every even year, a Kansas LQG or TSDF files the Biennial Report in RCRAInfo and the Monitoring Fee Form and payment in KEIMS, as two separate systems tied to one March 1 deadline (KDHE 2025 Hazardous Waste Report Instructions). Set up KEIMS access before January. The Monitoring Fee Form opens in KEIMS in January, and the fee payment is a required part of that complete submission.

Why Doesn’t the Kansas Tier II System Have a Submit Button?

Because the online record and the completed filing are two different things. The Kansas Tier II portal saves changes when you click Update, but KDHE’s own FAQ states the filing is not complete until the Certification Letter and Fee Calculation Worksheet are generated from the system and then mailed or emailed to KDHE’s Right-to-Know Program with payment (Kansas Tier II Online Reporting System FAQs). Site plans go as hard copy. A facility that saves its Tier II data and stops there has not filed.

KDHE’s FAQ also flags a specific failure mode worth checking on every submission: when the Optional Report box gets checked on a chemical that should not be optional, the fee worksheet comes back showing $0 due. A zero-dollar fee calculation on a facility that clearly owes a fee is the signal to go back and check that box on every listed chemical before mailing the certification.

How Much Do Kansas Hazardous Waste Generator Fees Cost, and When Are They Due?

Kansas charges a generator monitoring fee that has no federal counterpart at all, tiered by generator status and, for LQGs, by prior-year tonnage. The LQG fee is set by the facility’s prior-year tonnage, so a facility crossing 50 tons moves from $900 to $2,800, and crossing 500 tons moves from $2,800 to $8,000 (K.A.R. 28-31-10).

Generator or Facility TypeAnnual FeeDue Date
LQG, 5 tons or less$300Before March 1
LQG, 5 to 50 tons$900Before March 1
LQG, 50 to 500 tons$2,800Before March 1
LQG, over 500 tons$8,000Before March 1
SQG and KSQG$150Before April 1
Hazardous waste transporter$200Before January 1
TSDF, on-site storage$10,000Before January 1
TSDF, off-site thermal treatment, landfill, or UIC$18,000Before January 1
TSDF closure certification$14,000 post-closure feeOn closure certification

Kansas Tier II and Form R carry their own state fees on top of the generator fee schedule above. Tier II fees for extremely hazardous substances run $25, $50, or $150 across three quantity tiers; hazardous chemicals run $25, $50, $150, or $300 across four tiers; oil and gas wells pay a flat $25 (K.A.R. 28-65-4(a)). The Kansas Form R state fee runs $250 to $3,000 by release quantity, due before July 1 with the federal form, and K.S.A. 65-5704(b)(1)(D) caps the total at $3,000 per report year (K.S.A. 65-5704).

What Does a Missed Kansas Deadline Actually Cost?

The statutory penalty ceilings matter less to most facilities than the automatic late fees that attach with no inspection and no discretion. K.S.A. 65-3444(a) caps the hazardous waste civil penalty at $25,000 per violation, with each day a separate violation. K.S.A. 65-3018 caps the air penalty at $10,000, also per day (K.S.A. 65-3444, K.S.A. 65-3018). Those are ceilings that require an enforcement action to reach.

The late fees below require nothing but a missed date:

Missed DeadlineAutomatic Late Fee
Air emissions fee, past April 1Greater of $200 per day or 0.10% of annual emissions fees per day (K.A.R. 28-19-546)
UST permit fee, past April 30$50 per tank, plus $100 per tank if not secured by August 1 (K.A.R. 28-44-17)
UST registration filed after 7 days$50 per tank (K.A.R. 28-44-17)
AST permit fee, past December 31$50 per tank (K.A.R. 28-44-29)

A facility with twelve regulated USTs that misses April 30 and does not catch it until September owes $600 in late fees plus $1,200 more in the August 1 penalty, on top of the original $300 in permit fees, with no inspector involved at any point. KDHE will not issue the annual UST permit until all fees and penalties are paid, and operating a regulated UST without a displayed valid permit is prohibited outright.

Two Tank Deadlines, Two Different Dates

Facilities that think of “tanks” as one category miss one of these two dates every year. Underground storage tanks (USTs) owe a $25 per tank annual operating permit fee before April 30, with the late fees above attaching after that (K.A.R. 28-44-17(d)). Aboveground storage tanks (ASTs) owe a $10 per tank annual registration fee before December 31, with a $50 per tank late fee (K.A.R. 28-44-29). A plant with a diesel generator day tank, a fuel island, and a handful of process tanks can easily have both tank types on site, each on its own clock, each requiring the permit to be displayed where the public can see it.

Is Kansas Covered by EPA’s Multi-Sector General Permit for Stormwater?

No. Because KDHE has run the base NPDES program since 1974 and general permits since 1995, Kansas industrial sites operate under KDHE’s own general permit, independent of EPA’s Multi-Sector General Permit. The current Kansas industrial stormwater general permit is S-ISWA. Coverage requires a $60 fee with the Notice of Intent and another $60 annually to maintain coverage, paid through KEIMS, plus an annual comprehensive site compliance evaluation submitted under the facility’s SWP2 plan (KDHE S-ISWA Industrial Stormwater General Permit Fact Sheet).

One item here is genuinely unsettled, and we are stating it that way rather than guessing. KDHE’s S-ISWA fact sheet, dated March 10, 2026, describes the then-current permit as remaining effective through October 31, 2026, or administratively extended until a successor general permit is issued. Whether a successor permit has since been issued, and whether it changed the fee or the annual evaluation mechanics, could not be confirmed from a KDHE page at the time of this research. If your permit anniversary falls near that window, confirm current status directly with KDHE’s Industrial Stormwater Program at KDHE.IndustrialStormwater@ks.gov or (785) 296-5517 before assuming the fee and reporting mechanics are unchanged.

Is Kansas a Federal OSHA State or a State Plan State?

Federal OSHA. Kansas is not an OSHA-approved State Plan state, and federal OSHA covers most private-sector workers there (OSHA, State Plans). That means the Form 300A posting window, the electronic submission deadline, and every other OSHA recordkeeping interval are the federal dates with no Kansas overlay and no state portal layered on top. Our EHS compliance calendar covers those federal OSHA dates directly, and nothing in this post changes them.

Is a Kansas Hazardous Waste Fee Increase Coming?

Possibly, and this is still pending rather than in effect. A Kansas Register notice dated April 30, 2026 described amendments to K.A.R. 28-31-10 and a proposed new K.A.R. 28-31-10b that would raise the regulated community’s total annual cost from $850,000 to $1,459,332, replace the post-closure care fee with a groundwater-monitoring and corrective-action fee, and move the KSQG fee due date from April 1 to May 1 (Kansas Register Vol. 45, Issue 18, April 30, 2026). House Bill 2042, approved April 9, 2026 and effective April 16, 2026, authorized KDHE to adopt those rules (Kansas 2026 Session Laws, Chapter 116, HB 2042).

That April 30, 2026 notice covered the economic impact hearing, held June 1, 2026, and stated that a separate hearing on the substance of the rule itself would be noticed with at least 60 days’ advance notice. As of this writing, we could not confirm from a primary KDHE or Kansas Register source whether the amended fee schedule and the shifted KSQG due date have actually taken effect. Treat the fee schedule and April 1 KSQG due date in this calendar as the current, operative rules, and verify directly with KDHE’s Bureau of Waste Management before relying on either the old or the proposed new numbers for a year-ahead budget.

Building a Kansas Compliance Calendar That Actually Holds

The pattern across every item in this post is the same: a Kansas-specific date, fee, or portal sits on top of a federal framework that, on its own, would tell a facility it owes nothing. The KSQG tier, the annual hazardous waste report in non-biennial years, the state Tier II and Form R fees, the Class II air tier, and the per-tank fees on two separate dates all exist only because Kansas chose to go further than federal RCRA, EPCRA, and the Clean Air Act require. None of that shows up on a federal calendar, and most generic multi-state calendars flatten it into a single undifferentiated “state fee” line.

iSi Environmental’s compliance program management tracks the Kansas-specific layer described here alongside the federal calendar for facilities across Kansas, so KEIMS, SLEIS, and the Kansas Tier II portal get the same attention as RCRAInfo and EPA’s own systems. If you are not sure whether your facility’s monthly hazardous waste generation crosses the Kansas 25 kilogram KSQG line, or which of these filings your site already owes, talk to an environmental compliance team that tracks both calendars for a living.

Sources