Environmental Compliance
Your Safety Manager Is Excellent.
But Who Handles the Environmental Program?
In most manufacturing operations, the safety manager owns environmental compliance without deep environmental training. Reports are late. Permits lapse. Air compliance gaps accumulate quietly. iSi plugs in as your environmental subject matter expert — so your team stays compliant without a $130,000–$195,000 hire.
Environmental Compliance Services
We handle the environmental compliance work that requires deep regulatory knowledge and consistent execution — not the kind of work you can hand to a generalist.
Air Permitting & Compliance
Title V, minor source permits, NESHAP compliance, emission inventories, and air compliance recordkeeping. We manage the full air program lifecycle.
Stormwater Management
SWPPP development, stormwater permit applications, inspection schedules, monitoring programs, and corrective action. Compliant stormwater management across all your sites.
Environmental Reporting
Tier II, TRI, DMR, emission summaries, and annual compliance reports. Deadlines met. Data accurate. No last-minute scrambles.
SPCC Plans
Spill Prevention, Control, and Countermeasure plans developed, reviewed, and updated per EPA requirements. Including facility diagrams, inspection protocols, and training documentation.
Environmental Auditing
Comprehensive environmental compliance audits that identify gaps before regulators do. Prioritized findings with actionable corrective actions — not a 200-page binder.
Waste Management & RCRA
Hazardous waste determinations, generator status assessments, waste minimization plans, and RCRA compliance program development. Proper waste management from generation to disposal.
The Environmental Gap Most Companies Don't See
- Stormwater report was late last year. Air permit renewal — nobody's started it.
- The safety manager handles environmental on top of their real job.
- Tier II filing deadline is next month. Who's pulling the data?
- You're one inspection away from a finding leadership doesn't know about.
- A full-time environmental hire would cost $130,000–$195,000.
- Environmental reports on time. Every deadline tracked and met.
- Your safety manager has expert environmental backup.
- Compliance runs like a program — not a fire drill.
- Inspection readiness is built in, not scrambled together.
- iSi's COOP retainer starts at $15,000/year with a national team.
Multi-State Environmental Compliance
A 3-site manufacturer staffing EHS internally spends $390,000–$585,000 annually. iSi's COOP retainer covers all three sites for $15,000–$90,000 — one team, one retainer, 40 states. Consistent environmental management across your entire portfolio without hiring state-by-state.
Talk to Us About Multi-SiteCompliance Failure Cascades
Environmental compliance failures trigger multiple costs: regulatory citations ($5,000–$50,000+ per violation), remediation ($10,000–$100,000+ for stormwater, air permitting, waste handling), permit suspension or revocation (operational shutdown), emergency response ($25,000–$250,000+ for spills or releases), and legal defense ($15,000–$50,000+ per enforcement action).
Combined realistic scenario: $80,000–$150,000 in avoidable costs.
iSi's compliance management retainer? $24,000–$54,000/year for permit tracking, regulatory changes, compliance audits, and corrective action coordination. Prevent one moderate violation = $35,000 saved vs. $24,000–$54,000 invested. Prevent two = 3x–5x ROI.
Compliance Gaps Most Facilities Miss
These scenarios look compliant on the surface. Underneath, they carry real regulatory exposure. We find them at nearly every facility we assess for the first time.
Stormwater Permit on File, BMPs Unmaintained
Your stormwater permit is on file. But when was the last time someone actually checked the sediment basins, inspected the pollution prevention measures, or documented the BMP maintenance schedule?
A permit without maintained BMPs is worse than no permit — it's non-compliance of a permitted activity. EPA stormwater violations start at $37,500 per day under the Clean Water Act. A single inspection finding that stretches over weeks can result in settlements of $250,000–$1,000,000+.
Is this happening at your facility?
Tier II Reporting Based on a Three-Year-Old Inventory
You submit your annual Tier II emergency response reports on time. But is the chemical inventory behind those reports actually current? New processes, new chemicals, old chemicals phased out — if your inventory hasn't been updated in three years, your Tier II filing is based on obsolete data.
First responders would arrive at your facility working from a chemical list that doesn't match reality. EPA violations for inaccurate SARA Title III reporting run $25,000–$70,000.
Is this happening at your facility?
Air Permit That Hasn't Kept Up with Operations
Two years ago, you added production capacity. Did anyone check whether that modification triggers air permit changes? Facilities routinely outgrow their permits without filing for modifications.
Operating beyond permitted scope means $37,500–$70,117 per day in EPA air violations. A months-long violation can settle at $500,000–$2,000,000+.
Is this happening at your facility?
Audits, Permits, Stormwater, Tier II, and SPCC — the 2026 Mechanics
What does an environmental compliance audit cover?
A defensible audit cross-walks six federal statutes at once — Clean Air Act, Clean Water Act/NPDES, RCRA, EPCRA, TSCA, and SDWA where on-site water systems exist — asking four questions for every regulated activity: is this facility subject, do permit limits match what's happening on the floor, are the records complete, and were prior findings corrected. Deliverables are a severity-classified findings register, a corrective action plan with owners and due dates, and an EPA Audit Policy disclosure matrix — the policy still provides up to 100% gravity-based penalty mitigation when violations are disclosed within 21 days and corrected within 60. Facilities that audit on a 24–36 month cycle catch findings at four-figure exposure; facilities that audit after the inspection notice find five-to-six-figure exposure with reduced Audit Policy eligibility.
How long do EPA permits actually take?
Budget against the rate-limiting permit: a state minor-source air construction permit runs 4–6 months; PSD runs 12–24 months with dispersion modeling and BACT analysis. An individual NPDES permit runs 6–18 months; MSGP stormwater NOI coverage takes 30–60 days. RCRA Part B (TSDFs only) is the longest of any EPA permit at 2–4 years — but most industrial facilities only need VSQG/SQG/LQG generator status under 40 CFR 262.13, which is recordkeeping-only, not a permit.
Does your facility need an industrial stormwater permit?
If you're in one of 30 specified industrial sectors with materials or processes exposed to precipitation — yes, via the federal MSGP or your state's parallel permit (TCEQ TXR050000, KDHE Industrial Stormwater, ODEQ OKR05, MDNR General Permit). The operational core is the SWPPP — a living document with drainage mapping, pollutant source inventory, control measures, and quarterly visual inspection logs. Stormwater is the most-cited CWA finding because outfalls are inspectable from public rights-of-way; exposure runs up to $66,712 per day. The 2026 MSGP reissuance adds quarterly PFAS indicator monitoring across 23 sectors — new NOIs are required under the final permit.
Who files Tier II, and when?
Any facility that stored hazardous chemicals above threshold during the prior calendar year: 10,000 lb for ordinary hazardous chemicals with an SDS, or 500 lb / the TPQ (whichever is lower) for Extremely Hazardous Substances like chlorine and anhydrous ammonia. Deadline: March 1, no extensions, to three recipients — SERC, LEPC, and the local fire department. Kansas (kansas.tier2online.com), Missouri (MDNR e-filing), Oklahoma (ODEQ), and Texas (TCEQ STEERS) each run separate portals. Aggregation is by chemical across the whole facility — a one-week inventory peak obligates a full-year report.
Does your facility need an SPCC plan?
Yes, if aggregate aboveground oil storage exceeds 1,320 gallons in containers of 55 gallons or larger and a discharge could reasonably reach navigable waters (40 CFR Part 112). Capacity counts, not contents — eight 250-gallon totes puts a facility over threshold even half-full. Standard plans need Professional Engineer certification; Tier I/II qualified facilities can self-certify. Five-year re-certification is mandatory, material changes trigger immediate amendment, and post-spill inspections almost always cite plan currency and secondary containment sizing (typically 110% of the largest container).
How does multi-state compliance actually get managed?
Federal statutes are mostly delegated, so KDHE, MDNR, ODEQ, and TCEQ each impose their own portals, fees, forms, and data fields — identical facilities in Wichita and Tulsa file through entirely different systems. Environmental compliance is a portfolio problem: 12 sites with 12 independent approaches have 12 failure modes; one compliance calendar, one audit protocol, and one corrective-action register produces one failure mode and twelve early-warning signals. That is the structure iSi's COOP retainer maintains across every site.
Environmental Compliance Questions
What environmental compliance services does iSi provide?
Air permitting and compliance, stormwater management and SWPPP development, Tier II and TRI reporting, SPCC plans, environmental auditing, waste management programs, RCRA compliance, and new facility permitting support. All services are available nationally across 40 states.
How much does environmental compliance consulting cost?
iSi's COOP retainer provides ongoing environmental compliance support starting at $15,000/year — compared to $130,000–$195,000 for a fully-loaded senior environmental hire. Project-based work is also available with fixed pricing and quotes returned in under 30 minutes.
Can iSi manage environmental compliance for facilities in multiple states?
Yes. iSi operates in 40+ states and regularly manages multi-state compliance programs. One retainer covers all locations — consistent environmental management across your entire portfolio without hiring state-by-state.
What happens if my safety manager is handling environmental compliance without environmental training?
This is extremely common in manufacturing and industrial operations — and it's the primary gap iSi was built to close. Your safety manager keeps their role; iSi provides the deep environmental expertise they need to stay compliant, on-time, and inspection-ready.
Environmental Compliance Consulting by Location
Stop Hoping the Environmental Program Runs Itself
iSi plugs in as your environmental SME — 40 states, no long-term headcount, starting at $15,000/year.
Get Started