There is no single federal soil cleanup number. EPA screens at 1E-06, Kansas closes at 1E-05, Texas at 1E-04. What that spread means for your property.
A laboratory report comes back with arsenic at 40 mg/kg in the shallow soil behind a loading dock. The owner’s first question is almost always what it will cost to dig it out. The question that actually decides the project is a different one: which number does this property have to get below, which agency sets that number, and what document proves the file is closed.
There is no single federal soil cleanup standard. EPA publishes a screening tool and says in writing that it is not a cleanup standard. The six states iSi works in each publish their own answer to how clean is clean, and they do not agree with each other or with EPA. The target risk level applied to that same 40 mg/kg result spans two orders of magnitude depending on who is asking. That spread, not the price of a truck, is what sets the scope of soil remediation work on a contaminated property.
If the contamination came from an underground storage tank, read the deadline section below before anything else. Four federal deadlines run from the date the release was confirmed, the shortest is 24 hours, and none of them wait for you to decide on a remedy.
This post covers what happens after contamination is confirmed. For the due diligence before it, see Phase I ESA requirements under ASTM E1527, and EPA Brownfields grant Phase I ESA requirements for the grant-funded path.
Is there a federal soil cleanup standard, and can EPA Regional Screening Levels be used as cleanup levels?
No. EPA states that “The RSLs are not cleanup standards and should not be used as cleanup levels” (EPA, Regional Screening Levels). The generic tables are screening values built on a 1E-06 target cancer risk and published at target hazard quotients of 1.0 and 0.1. An exceedance triggers further investigation, not a remediation obligation. The binding number comes from the state program or the site decision document.
The structure of the tables makes the screening purpose plain. EPA publishes separate generic tables for a Resident Soil scenario, a Composite Worker Soil scenario and a Resident Soil to Groundwater pathway, because the same concentration means different things under different exposure assumptions. EPA’s own change log records a November 2023 clarification that the RSLs are “to be used as screening levels and not preliminary remediation goals” (EPA, RSL What’s New). The same page carries EPA’s recommended residential soil screening value for lead at 200 ppm, dropping to 100 ppm where another source of lead is present.
A Phase II report listing detections against RSLs has told you where to look, not what to do. Treating that exceedance as a cleanup obligation commits an owner to a number ten to a hundred times more stringent than the one the state will close the file on.
What target cancer risk sets a soil cleanup number, and why do Kansas, Texas and EPA use different ones?
Three different risk targets govern the same question. EPA’s generic RSLs use 1E-06. Kansas Tier 2 risk-based values in the RSK Manual, 6th version, July 2021 use 1E-05 with a hazard index of 1. Texas applies a cumulative target risk of 1E-04 and a cumulative hazard index of 10 under 30 TAC 350.72. That spans two orders of magnitude.
Kansas publishes real numbers rather than a method. The RSK Manual’s Appendix A Risk-Based Summary Table gives separate residential and non-residential soil values along with soil-to-groundwater and soil saturation values. Arsenic sits at 18.9 mg/kg residential and 63.2 mg/kg non-residential. The tier structure is genuinely three-part: Tier 1 compares a naturally occurring constituent to background, Tier 2 compares results to the Appendix A default values, and Tier 3 substitutes site-specific inputs under Bureau of Environmental Remediation oversight, with the manual stating that where Tier 2 goals are not protective the more stringent Tier 3 goals apply.
Texas sets its ceiling at the cumulative level instead of the constituent level. Under 30 TAC Chapter 350, the Texas Risk Reduction Program develops Tier 1 protective concentration levels under 30 TAC 350.75 for residential and commercial or industrial land use classified under 30 TAC 350.53, then caps the total across all constituents and pathways at a target risk of 1E-04 and a hazard index of 10 (TCEQ, Tier 1 PCL Tables, RG-366/TRRP-23).
Same result, same soil, three answers. Which number binds you depends on which door the property entered through, and that is a jurisdictional question before a technical one.
What has to be reported after a confirmed underground storage tank release, and on what clock?
Four deadlines run from release confirmation under 40 CFR part 280 subpart F. Initial response and reporting within 24 hours (280.61). Initial abatement summary within 20 days (280.62). Initial site characterization within 45 days (280.63). Free product removal report within 45 days (280.64). The clock starts at confirmation, not at discovery of its significance.
The hardest deadlines in this post:
- 24 hours from release confirmation: report the release and begin initial response, 40 CFR 280.61.
- 20 days from release confirmation: submit the initial abatement summary report, 40 CFR 280.62.
- 45 days from release confirmation: submit initial site characterization information, 40 CFR 280.63.
- 45 days from release confirmation: submit the free product removal report, 40 CFR 280.64.
These are rolling deadlines, not calendar dates. Each confirmed release starts its own set, so a property with several tanks can carry several clocks at once. Public notice is separately required for each confirmed release needing a corrective action plan under 40 CFR 280.67. None of it cares whether you owned the property when the tank leaked.
This is also the most common route into a soil cleanup at all: dispenser islands, hydraulic lifts and heating oil tanks all land here. The national UST cleanup backlog still stood at 53,777 sites at the end of FY2025, down from 102,798 at the end of FY2008 (EPA FY2027 Congressional Justification, Leaking Underground Storage Tanks).
Which cleanup program does my contaminated property fall under?
Four tracks exist and the facility decides, not the contaminant. CERCLA and 40 CFR part 300 for listed and federal-lead sites. RCRA corrective action under 40 CFR 264.101 for permitted facilities. 40 CFR part 280 subpart F for underground storage tank releases. A state voluntary cleanup program for everything else, which is where most commercial property owners land by choice.
That last point is worth sitting with. An owner with an exceedance, a lender wanting resolution, and no open agency file is not under an order. They enter a state voluntary cleanup program because the transaction needs a closure document, which means what they are buying is a piece of paper from a state agency, not the absence of contamination. How a lender actually reads a known-contaminated commercial property is the posture that drives most of these decisions.
Owners on or adjacent to a CERCLA site are in a different position: they are usually not the decision maker, the remedy is selected against the nine criteria discussed below, and if hazardous substances remain in place the site goes onto a periodic review cycle indefinitely under CERCLA 121(c), 42 U.S.C. 9621(c). That cycle has its own mechanics, which are covered in what a five-year review actually examines at a Kansas contaminated site.
Does RCRA corrective action apply if my facility never had a hazardous waste permit?
Not under RCRA 3004(u), which reaches facilities seeking a permit and applies to permits issued after November 8, 1984. An interim status facility operating under 42 U.S.C. 6925(e) is instead reachable under RCRA 3008(h), 42 U.S.C. 6928(h), which authorizes a corrective action order on a finding that there is or has been a release. Different trigger, different procedure.
The asymmetry matters for manufacturers. RCRA 3004(u), 42 U.S.C. 6924(u), requires corrective action for all releases from any solid waste management unit at a facility seeking a permit, “regardless of the time at which waste was placed in such unit.” The obligation attached through the permit, so the age of the release is not a defense. The units it reaches are the ones the facility itself inventoried in the Part B application under 40 CFR 270.14(d). Implementation runs through 40 CFR 264 subpart F and the subpart S provisions, including corrective action management units at 40 CFR 264.552.
Practitioners conflate 3004(u) and 3008(h) constantly, and the conflation changes who holds the initiative: one is a permit condition you negotiate, the other is an order EPA issues on a finding. The 2026 deregulatory cycle touched this framework without reducing it, covered in what the Q2 2026 deregulatory cycle did and did not do to RCRA corrective action. The withdrawn proposal would have applied the broader statutory hazardous waste definition to corrective action at solid waste management units; withdrawing it left 3004(u), 3004(v) and 40 CFR 264.101 where they were.
How does EPA decide between digging soil out and leaving it in place?
Through nine criteria at 40 CFR 300.430(e)(9)(iii): overall protection of human health and the environment, compliance with ARARs, long-term effectiveness and permanence, reduction of toxicity, mobility or volume through treatment, short-term effectiveness, implementability, cost, state acceptance and community acceptance. The first two are threshold criteria. Cost is criterion (G), seventh of nine, not first.
The ordering is not decorative. Criteria (A) and (B) are thresholds a remedy has to clear before the other seven are weighed at all, and (B) is where the state’s numbers enter a federal decision: CERCLA 121(d)(2)(A), 42 U.S.C. 9621(d)(2)(A), requires a remedy that leaves hazardous substances on site to meet applicable or relevant and appropriate requirements. A Kansas or Texas cleanup level can become an ARAR in a CERCLA record of decision, which is how a state risk target ends up binding a federal remedy.
Criterion (D), reduction of toxicity, mobility or volume through treatment, distinguishes excavation and treatment from containment, and it is a balancing criterion rather than a threshold. That is the structural reason containment wins so often: it clears both thresholds while scoring poorly on permanence, and the regulation permits that trade. Cost sits seventh. Owners who assume the agency is working their budget have the sequence backwards.
Which agency runs the voluntary cleanup program in each state iSi serves, and what document closes the file?
Six programs, six closure instruments. Kansas: KDHE Voluntary Cleanup and Property Redevelopment Program, No Further Action determination. Oklahoma: ODEQ under 27A O.S. 2-15-101 et seq., Certificate of No Action Necessary or Certificate of Completion. Texas: TCEQ Texas Risk Reduction Program, 30 TAC Chapter 350. Missouri: MDNR Brownfields/Voluntary Cleanup Program, certificate of completion. Nebraska: DWEE under the Remedial Action Plan Monitoring Act, No Further Action letter. Colorado: CDPHE Voluntary Cleanup and Redevelopment Program, No Action Determination.
Name the closure document correctly: that is what a buyer’s counsel and a lender’s reviewer ask for.
| State | Agency and program | Closure instrument | Numeric soil table published |
|---|---|---|---|
| Kansas | KDHE, VCPRP | No Further Action determination | Yes, RSK Manual Appendix A |
| Oklahoma | ODEQ, Voluntary Cleanup and Brownfields Certificate programs | Certificate of No Action Necessary or Certificate of Completion | No, risk-based routes only |
| Texas | TCEQ, Texas Risk Reduction Program | Response action completion under Remedy Standard A or B | Yes, Tier 1 PCL spreadsheets |
| Missouri | MDNR, Brownfields/Voluntary Cleanup Program | Certificate of completion | Yes, MRBCA Tier 1 target levels |
| Nebraska | DWEE, Voluntary Cleanup Program | No Further Action letter | Yes, Remediation Goals Lookup Tables |
| Colorado | CDPHE, VCUP | No Action Determination letter | None located |
Kansas. The KDHE Voluntary Cleanup Unit runs the VCPRP and issues a No Further Action determination to developers and buyers who complete a successful cleanup, and may issue one to adjacent owners who did not contribute to the contamination. Applications go through KEIMS, accepted online since January 2022. Institutional controls run through environmental use controls at K.S.A. 65-1,221 through 65-1,235. One honest gap: KDHE’s program pages give no statutory citation for the VCPRP itself, so this post cites the program and the RSK Manual rather than a statute section. The Kansas site-specific cleanup level and recorded use restriction mechanics, including the Agency Decision Statement and its comment window, are covered in the KDHE Agency Decision Statement and public comment process.
Oklahoma. Authority is the Oklahoma Brownfields Voluntary Redevelopment Act, 27A O.S. 2-15-101 et seq., with rules at OAC 252:221. Section 252:221-3-12 authorizes the two closure documents. Oklahoma publishes no numeric soil table: 252:221-3-3(5) lets a participant compare results to DEQ-approved screening levels, calculate a default risk-based cleanup level under DEQ guidance, or run a site-specific risk assessment. Read the liability release narrowly. Under 27A O.S. 2-15-106 and 2-15-108 it does not cover pollution the participant causes outside the certificate’s scope, pollution from later redevelopment, or existing pollution not addressed before issuance (ODEQ cleanup and redevelopment programs).
Missouri. MDNR’s Brownfields/Voluntary Cleanup Program runs under the Hazardous Substance Environmental Remediation Law, with RSMo 260.569.3 listing the grounds for removing a participant. Risk decisions run through Missouri Risk-Based Corrective Action, codified at 10 CSR 25-18.018, effective October 31, 2009, and used for both BVCP and underground storage tank sites. MRBCA has three tiers of increasing site-specificity, with most sites closing under Tier 1 against Risk-Based Target Levels, and Appendix B is titled “Default Target Levels and Tier 1 Risk-Based Target Levels, June 2006.” MRBCA’s numeric target cancer risk and hazard quotient were not located on the MDNR pages reached for this post, so no Missouri risk target is stated here. Closure is a certificate of completion, which MDNR also calls a no further action letter, after which EPA Region 7 agrees not to pursue federal action on the addressed contamination based on information available at the time.
Nebraska. The agency is the Department of Water, Energy and Environment, following the 2025 merger of the former environment and natural resources departments, and dwee.nebraska.gov is live and serving the program pages. The Voluntary Cleanup Program was created in 1995 by the Remedial Action Plan Monitoring Act. Closure is a No Further Action letter issued after DWEE approves the final Remedial Action Report, which the applicant must prepare within 60 days of completing the approved Remedial Action Plan under Neb. Rev. Stat. 81-15,185.03; the companion verified section is Neb. Rev. Stat. 81-15,185, on approval of a voluntary remedial action plan. The full statutory range for the Act was not confirmed, so only those two sections are cited. Numeric goals sit in the Remediation Goals Lookup Tables at Attachment 2-6 of the March 2021 guidance, document 18-162, whose changes were largely editorial: the remediation goals were not revised, so the September 2018 goals still apply. A 2006 memorandum of agreement with EPA Region 7 provides federal Superfund enforcement protection for eligible completed sites.
Colorado. CDPHE runs the Voluntary Cleanup and Redevelopment Program, created in 1994 under Title 25, Article 16, Part 3, C.R.S. (25-16-301 et seq.). The closure instrument is a No Action Determination letter, which CDPHE describes as assurance banks can accept that the state or EPA will not order a conventional cleanup. The mechanics are distinctive: review of a submitted cleanup plan happens within 45 days, review is billed at 140 dollars per hour, and after the cleanup the owner submits the completion report as a new No Action Determination application, which the program reviews and concurs with. CDPHE expressly does not provide construction or cleanup oversight; the owner owns the cleanup and its verification. The administering division is not named on the program page reached, so this post says CDPHE.
What is the difference between TRRP Remedy Standard A and Remedy Standard B in Texas?
Remedy Standard A, 30 TAC 350.32, requires removal or decontamination of affected media with no control measures allowed, and is self-implementing. Remedy Standard B, 30 TAC 350.33, permits leaving contamination in place behind physical controls, requires TCEQ approval of a Response Action Plan, and always requires institutional controls. Choosing B changes the property record permanently.
TRRP has two remedy standards, not three, and the distinction is worth stating because the error is common. TCEQ guidance RG-366/TRRP-28, revised October 2008, describes Standard A at 30 TAC 350.32 and Standard B at 30 TAC 350.33, and identifies the facility operations area provisions at 30 TAC 350.131 through 350.135 as an exception, not a third standard. Chapter 350 took effect September 23, 1999 and was revised effective March 19, 2007, March 19, 2009 and February 6, 2025.
Under Standard A institutional controls are only sometimes required, with triggers including commercial or industrial land use, the use of controls, or a response action expected to run beyond 15 years. Under Standard B they are always required. TCEQ defines an institutional control as a deed notice, a Voluntary Cleanup Program Certificate of Completion, a restrictive covenant, or an equivalent zoning or governmental ordinance. Every one of the six states has this same fork in substance. Texas just writes it down most clearly.
What is an institutional control and what does it do to my property after cleanup?
EPA recognizes four categories: governmental controls such as zoning, proprietary controls such as easements and covenants that create interests in the chain of title, enforcement and permit tools, and informational devices such as deed notices and registries (EPA, Institutional Controls: A Site Manager’s Guide, OSWER 9355.0-74FS-P, September 2000). Physical barriers like fences are not institutional controls. Proprietary controls run with the land and bind successors.
This is the part nobody tells the owner. Most risk-based closures do not remove the contamination. They leave it in place at a concentration acceptable for a stated land use and secure that land use by recording an instrument against the deed. The instrument does not expire when the consultant demobilizes. It follows the parcel, it is disclosed to every future buyer and lender, and in several states it carries a continuing obligation.
The published mechanics are concrete. Missouri records a covenant restricting land use in the chain of title where contamination remains above unrestricted residential levels, places the site in Long-Term Stewardship, and assesses a one-time 15,000 dollar long-term stewardship fee before the certificate of completion issues. Oklahoma records the Certificate of No Action Necessary and its Land Use Disclosure in the county land records, where the restrictions run with the land; ODEQ posts recorded controls from its brownfields certificate files, and one such instrument for a commercial property in Oklahoma City, filed with the county clerk on December 29, 2021, restricts the property to commercial use only, prohibits use of groundwater as a potable or irrigation source, binds all owners and users, and requires DEQ approval plus a recordable notice of remediation before the land use can change. Kansas uses environmental use controls under K.S.A. 65-1,221 through 65-1,235.
EPA’s own guidance then catalogs how these controls fail. The Site Manager’s Guide warns that governmental controls can be changed or ended with little notice to EPA, which generally cannot enforce them; that proprietary controls depend on state property law and some courts do not recognize easements in gross; that enforcement tools usually bind only signatories and may not reach later owners; and that informational devices may not be enforceable at all. It notes that the National Contingency Plan cautions against institutional controls as the sole remedy unless active measures are impracticable, and that adding controls as an afterthought “could undermine the whole remedy.” That is EPA criticizing risk-based closure from the inside.
Whether a state closure letter satisfies a particular lender, and which states have adopted the Uniform Environmental Covenants Act, are separate questions answered in what buyers and lenders have to check on a delisted Superfund parcel.
The restriction binds your parcel permanently. EPA’s own auditors found the agency often is not recording it.
EPA’s Office of Inspector General reviewed 70 Superfund sites slated for roughly 1.4 billion dollars in infrastructure-law construction funding and found the institutional control record largely absent (OIG Report 25-E-0020, March 19, 2025). Of the 29 sites with implemented institutional controls, 15, about 52 percent, had no institutional control data in the Superfund Enterprise Management System module built to hold it, covering about 483 million dollars in allocations. Of the 52 sites with planned controls, 41, about 79 percent, had no data in the module, covering about 956 million dollars.
Four regions, spanning 25 sites, do not update the module at any site milestone. EPA’s Office of Land and Emergency Management disagreed with the recommendation to make the next version of the system track planned controls, leaving that recommendation unresolved.
Read that against the closure model above. Risk-based closure rests on a land use restriction being recorded, findable and enforceable for the life of the property, and a federal audit found the tracking system held no record of the restriction at a majority of the sites it examined. The instruction for an owner is unglamorous: keep your own complete closure file, including the recorded instrument with its county recording data, the approved work plan, the confirmation sampling results, the risk basis you closed against, and the agency’s letter. That gap does not surface while you own the property. It surfaces when a buyer’s consultant goes looking during diligence.
What does a state charge to oversee a voluntary cleanup, and is there a fee for leaving contamination in place?
Published program fees vary. Missouri: 200 dollar application fee, initial oversight deposit capped at 5,000 dollars, and a one-time 15,000 dollar long-term stewardship fee where a covenant is required. Nebraska: 2,000 dollar application plus 3,000 dollar deposit. Colorado: 140 dollars per hour. Remediation construction cost itself is project-specific and no published figure applies.
Missouri bills quarterly above the deposit and refunds the unused balance, responds to an application usually within 30 days, and reviews documents usually within 60 days with up to 180 allowed by regulation. Entry requires form MO 780-1712, a consent for access on form MO 780-1713, and at least a Phase I. Nebraska bills additional oversight for complicated sites or inadequate submittals. Colorado commits to 45 days on a cleanup plan. Kansas takes applications through KEIMS. These are agency oversight charges only. No credible figure exists for the physical work until the standard, the medium and the volume are known.
What is a property owner’s real financial exposure for soil contamination?
Usually cost recovery, not a per-day fine. CERCLA 107(a), 42 U.S.C. 9607(a), reaches current owners and operators, owners and operators at the time of disposal, arrangers and transporters for response costs and natural resource damages. In FY2025 EPA obtained 714.3 million dollars in private party cleanup commitments and recovered 174.1 million dollars in past costs.
Liability attaches “notwithstanding any other provision or rule of law, and subject only to the defenses set forth in subsection (b).” The statute does not use the words strict or joint and several; courts supply that construction. The subsection (b) defenses are narrow, requiring that the release was caused solely by an act of God, an act of war or a third party act, with due care and precautions taken. CERCLA 9607(e)(1) closes the obvious workaround: an indemnification or hold-harmless agreement cannot transfer liability under the section. A buyer’s contract language does not move CERCLA liability, it creates a private claim against a counterparty who may or may not be solvent. No court decision narrowing CERCLA contribution or cost-recovery rights was verified for this post.
Statutory penalties are real but secondary for a property owner. Under 40 CFR 19.4 Table 1, for penalties assessed on or after January 8, 2025 (inflation adjustment source note 90 FR 1377), CERCLA 9609(a)(1) class I penalties run to 71,545 dollars per violation, and 9609(b) and 9609(c) penalties run to 71,545 dollars per day, rising to 214,637 dollars per day for a second or subsequent violation. On the RCRA side, 42 U.S.C. 6928(a)(3) reaches 124,426 dollars, 6928(c) 74,943 dollars, 6928(g) 93,058 dollars and 6928(h)(2) 74,943 dollars. Those attach to reporting and order-compliance failures. The cleanup bill attaches to owning the dirt. In FY2025 EPA finalized 477 enforcement tools at 239 sites and 65 enforcement instruments across 55 sites, plus about 94.5 million dollars billed for oversight.
Does EPA have a soil cleanup level for PFAS?
No. EPA’s Office of Land and Emergency Management is still “looking into available information” on soil with low PFAS concentrations, with written input closed May 29, 2026, and an EPA speaker stated “we don’t have a quantitative range” (EPA OLEM, Input from Spring 2026 PFAS in Soil Engagement Sessions). PFOA and PFOS are nonetheless CERCLA hazardous substances effective July 8, 2024 at a one pound reportable quantity (89 FR 39124).
The absence is the story. No state in iSi’s region was found to publish numeric soil screening or cleanup levels for PFOA or PFOS. In those same EPA sessions a Colorado representative stated, “We defer to EPA RSLs,” and EPA has not issued PFAS soil screening levels, which makes that deferral a reference to a table that does not exist for these compounds. Nationally the picture is a patchwork rather than a regional gap: New Jersey said it is “not looking to establish background values for PFAS,” New York plans to use background values for cleanup objectives, and Alaska uses migration-to-groundwater levels as a bright line.
Two consequences land now, before any number exists. First, the designation survived judicial review: the D.C. Circuit denied all petitions on August 18, 2026 in No. 24-1193, so the one pound reportable quantity is settled law and an excavation that mobilizes PFAS-bearing soil can create a reporting obligation through the remediation itself. Second, dig and haul assumes a receiving facility. In EPA’s 2026 sessions multiple states reported landfills refusing soils containing PFAS, and a utilities association reported limited disposal outlets for soils above the Massachusetts and New Hampshire cleanup standards. Auditing PFAS sources before the liability attaches is the cheaper sequence.
What the funding and screening signals say about waiting
Three signals point the same direction, and none of them favors delay.
EPA’s screening table has gone stale on its own published cadence. The tables were updated every May and November from 2014 through 2024. The most recent dated entry in EPA’s change log is November 13, 2024, with nothing after it, although the page itself was last modified March 13, 2026. A report citing “the current RSLs” in late 2026 cites a two-year-old table whose semiannual refresh appears to have lapsed.
Federal UST cleanup money is being cut hard against a backlog that has not cleared. EPA’s FY2027 congressional justification requests 53,259 thousand dollars for the LUST appropriation against an FY2026 enacted operating plan of 88,903 thousand dollars, a reduction of 35,644 thousand dollars or roughly 40 percent. LUST Prevention is proposed for elimination, from 24,320 thousand dollars to zero. LUST Cooperative Agreements, the line funding state cleanup work, drops from 52,838 to 38,840 thousand dollars. The fund itself is financed by a 0.1 cent tax per gallon of motor fuel sold nationwide. The backlog was 53,777 sites at the end of FY2025.
Enforcement is not quiet, though. The FY2025 figures above are the counterweight: the money being cut would have cleaned the site for somebody. The authority that makes an owner pay for it is intact. And no state in the region was found to have loosened its numeric soil cleanup levels this cycle. The Kansas RSK Manual has stood at its 6th version since July 2021, and Nebraska’s 2021 update left the September 2018 remediation goals in force. That is stasis, not relaxation.
What to do after a confirmed exceedance
- Compare laboratory results to the operative state standard, not the EPA RSL: in Kansas the RSK Manual Appendix A column matching intended use, in Texas the Tier 1 PCL tables under 30 TAC 350.75 at the land use classified under 30 TAC 350.53.
- If the source is an underground storage tank, work the 24 hour, 20 day and 45 day clocks from the date of release confirmation.
- Determine whether a federal program already owns the site. A post-November 8, 1984 RCRA permit makes corrective action a permit condition, not something a voluntary program replaces.
- Choose the remedy standard deliberately, because that choice decides whether your deed changes.
- Apply in writing and budget the published oversight fees for your state.
- Price the stewardship obligation, not just the construction, if anything will remain above unrestricted residential levels.
- Obtain the closure document, read what it does not cover, and keep your own complete file.
- Before a crew mobilizes, settle the field documents and the off-site soil determination, covered in a remediation contractor’s HASP and SWPPP requirements.
Where this leaves you
The owner’s question was never how much it costs to dig. It is which number closes the file, and whether the cheaper path leaves a restriction recorded against the property forever. The state program the property sits in answers both, and the six programs in this region answer them differently.
iSi Environmental works the regulatory side of that problem: site characterization, evaluating results against the standard that governs in Kansas, Oklahoma, Texas, Missouri, Nebraska or Colorado, selecting the program, negotiating scope with the agency, and assembling the closure documentation a buyer or lender asks for by name. iSi is a consulting firm, not a licensed remediation contractor, not a disposal facility and not a laboratory; the oversight and the regulatory file are the deliverable. If you have a result in hand and do not know which number applies to it, send us the report. We respond same day, usually within 30 minutes.
Sources
- EPA, Regional Screening Levels overview: https://www.epa.gov/risk/regional-screening-levels-rsls (verified 2026-11-20)
- EPA, Regional Screening Levels generic tables: https://www.epa.gov/risk/regional-screening-levels-rsls-generic-tables (verified 2026-11-20)
- EPA, Regional Screening Levels What’s New change log: https://www.epa.gov/risk/regional-screening-levels-rsls-whats-new (verified 2026-11-20)
- eCFR, 40 CFR 300.430, CERCLA remedy selection: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-300/subpart-E/section-300.430 (verified 2026-11-20)
- eCFR, 40 CFR part 280 subpart F, UST release response: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-I/part-280/subpart-F (verified 2026-11-20)
- eCFR, 40 CFR part 264 subpart F: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-I/part-264/subpart-F (verified 2026-11-20)
- eCFR, 40 CFR 264.101, corrective action for SWMUs: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-I/part-264/subpart-F/section-264.101 (verified 2026-11-20)
- govinfo, 40 CFR 264.552, corrective action management units: https://www.govinfo.gov/link/cfr/40/264?sectionnum=552&year=mostrecent (verified 2026-11-20)
- govinfo, 40 CFR 270.14, Part B application contents: https://www.govinfo.gov/link/cfr/40/270?sectionnum=14&year=mostrecent (verified 2026-11-20)
- govinfo, 40 CFR 19.4 Table 1, civil penalty inflation adjustments, 90 FR 1377: https://www.govinfo.gov/link/cfr/40/19?sectionnum=4&year=mostrecent (verified 2026-11-20)
- govinfo, 42 U.S.C. 9607, CERCLA 107 liability: https://www.govinfo.gov/content/pkg/USCODE-2023-title42/html/USCODE-2023-title42-chap103-subchapI-sec9607.htm (verified 2026-11-20)
- govinfo, 42 U.S.C. 9621, CERCLA 121 cleanup standards and periodic review: https://www.govinfo.gov/content/pkg/USCODE-2023-title42/html/USCODE-2023-title42-chap103-subchapI-sec9621.htm (verified 2026-11-20)
- govinfo, 42 U.S.C. 6924, RCRA 3004(u) and (v): https://www.govinfo.gov/content/pkg/USCODE-2023-title42/html/USCODE-2023-title42-chap82-subchapIII-sec6924.htm (verified 2026-11-20)
- govinfo, 42 U.S.C. 6928, RCRA 3008 including (h): https://www.govinfo.gov/content/pkg/USCODE-2023-title42/html/USCODE-2023-title42-chap82-subchapIII-sec6928.htm (verified 2026-11-20)
- Federal Register, 89 FR 39124, PFOA and PFOS designated CERCLA hazardous substances: https://www.govinfo.gov/content/pkg/FR-2024-05-08/html/2024-08547.htm (verified 2026-11-20)
- D.C. Circuit, No. 24-1193, decided August 18, 2026, petitions denied: https://media.cadc.uscourts.gov/opinions/docs/2026/08/24-1193-2188689.pdf (verified 2026-11-20)
- EPA, Institutional Controls: A Site Manager’s Guide, OSWER 9355.0-74FS-P: https://www.epa.gov/sites/default/files/documents/icfactfinal.pdf (verified 2026-11-20)
- EPA, Superfund institutional controls guidance index: https://www.epa.gov/superfund/superfund-institutional-controls-guidance-and-policy (verified 2026-11-20)
- EPA OIG, Report 25-E-0020, March 19, 2025: https://www.epa.gov/sites/default/files/oig/documents/_epaoig_20250319-25-e-0020_cert.pdf (verified 2026-11-20)
- EPA, FY2025 Superfund cleanup enforcement annual results: https://www.epa.gov/enforcement/enforcement-and-compliance-assurance-annual-results-fy-2025-superfund-cleanup (verified 2026-11-20)
- EPA, Leaking Underground Storage Tank Trust Fund: https://www.epa.gov/ust/leaking-underground-storage-tank-trust-fund (verified 2026-11-20)
- EPA, FY2027 Congressional Justification, LUST, tab 08: https://www.epa.gov/system/files/documents/2026-06/tab-08_leaking-underground-storage-tanks.pdf (verified 2026-11-20)
- EPA OLEM, Input from Spring 2026 PFAS in Soil Engagement Sessions: https://www.epa.gov/system/files/documents/2026-07/input-spring-2026-pfas-in-soil-engagement-sessions_1.pdf (verified 2026-11-20)
- KDHE, Voluntary Cleanup Unit, VCPRP: https://www.kdhe.ks.gov/561/Voluntary-Cleanup-Unit (verified 2026-11-20)
- KDHE, Risk-based Standards for Kansas: https://www.kdhe.ks.gov/775/Risk-based-Standards-for-Kansas (verified 2026-11-20)
- KDHE, RSK Manual, 6th version, July 2021: https://www.kdhe.ks.gov/DocumentCenter/View/15300/Risk-based-Standards-for-Kansas-RSK-Manual---6th-Version-July-2021-PDF (verified 2026-11-20)
- KDHE, Environmental Use Control statutes, K.S.A. 65-1,221 through 65-1,235: https://www.kdhe.ks.gov/DocumentCenter/View/2783/Environmental-Use-Control-Statutes-PDF (verified 2026-11-20)
- TCEQ, Texas Risk Reduction Program, rule revision history: https://www.tceq.texas.gov/remediation/trrp (verified 2026-11-20)
- TCEQ, Application of Remedy Standards A and B, RG-366/TRRP-28: https://www.tceq.texas.gov/downloads/remediation/trrp/application-of-remedy-standards-a-and-b-trrp-28.pdf (verified 2026-11-20)
- TCEQ, Tier 1 PCL Tables, RG-366/TRRP-23: https://www.tceq.texas.gov/downloads/remediation/trrp/tier-1-pcl-tables-trrp-23.pdf (verified 2026-11-20)
- ODEQ, Cleanup and Redevelopment programs index: https://oklahoma.gov/deq/divisions/land-protection/cleanup-redevelopment.html (verified 2026-11-20)
- ODEQ, Brownfields Certificate Program: https://oklahoma.gov/deq/divisions/land-protection/cleanup-redevelopment/brownfields/brownfields-certificate-program.html (verified 2026-11-20)
- ODEQ, OAC Title 252 Chapter 221, Brownfields: https://oklahoma.gov/content/dam/ok/en/deq/documents/deqmainresources/221-1.pdf (verified 2026-11-20)
- MDNR, Brownfields/Voluntary Cleanup Program, PUB2035: https://dnr.mo.gov/document-search/what-brownfields-voluntary-cleanup-program-pub2035/pub2035 (verified 2026-11-20)
- MDNR, Missouri Risk-Based Corrective Action, 10 CSR 25-18.018: https://dnr.mo.gov/waste-recycling/investigations-cleanups/missouri-risk-based-corrective-action-mrbca (verified 2026-11-20)
- MDNR, Departmental MRBCA technical guidance: https://dnr.mo.gov/waste-recycling/investigations-cleanups/public-guidance-assistance/missouri-risk-based-corrective-action-mrbca/departmental (verified 2026-11-20)
- DWEE, Voluntary Cleanup Programs, fees and NFA letter: https://dwee.nebraska.gov/land-waste/voluntary-cleanup-programs (verified 2026-11-20)
- DWEE, VCP Guidance Document, March 2021 version, 18-162: https://dwee.nebraska.gov/sites/default/files/publications/VCP%20Guidance%20Document%20Complete%20Oct%202021_0.pdf (verified 2026-11-20)
- Nebraska Legislature, Neb. Rev. Stat. 81-15,185.03: https://www.nebraskalegislature.gov/laws/statutes.php?statute=81-15%2C185.03&print=true (verified 2026-11-20)
- CDPHE, Voluntary Cleanup and Redevelopment Program: https://cdphe.colorado.gov/hm/voluntary-cleanup (verified 2026-11-20)