Texas Environmental Reporting Deadlines: The TCEQ Dates, Fees and Portals a Federal List Misses
Every TCEQ reporting deadline, fee and portal a federal EPA calendar misses: the December 28 stormwater renewal, Class 1 waste, Tier II fees and air fees.
If you already run a federal EPA and OSHA compliance calendar, you have the Tier II date, the TRI date and the RCRA Biennial Report cycle covered. What a federal list does not carry is the Texas layer on top of it: a second waste class with its own registration trigger, an annual waste report with two due dates depending on how you file, a Tier II filing fee, a separate state TRI filing and fee, a 90-day Tier II update clock with no federal counterpart, and a per-ton waste fee invoiced every September. Nearly all of it goes to one agency, the Texas Commission on Environmental Quality (TCEQ), through one portal, the State of Texas Environmental Electronic Reporting System (STEERS) (TCEQ, Electronic Reporting).
This is the Texas environmental reporting layer with a citation behind every date, and it starts with the nearest one. The industrial stormwater renewal deadline is Monday, December 28, 2026, about five weeks from this writing. It is not the date printed in the permit, and it is not the date on TCEQ’s own due dates page.
Two agency boundaries decide whether a filing is even TCEQ’s to receive. The Texas Department of State Health Services (DSHS) does not take Tier II and has not since 2015. The Railroad Commission of Texas (RRC) takes production-side oil and gas filings. Texas is authorized for RCRA and runs its own NPDES program as TPDES, but it is not an OSHA State Plan state, so every OSHA recordkeeping interval is the federal date with no state overlay (OSHA, State Plans). Our EHS compliance calendar covers the federal dates. This post covers what Texas adds.
When Is the Texas MSGP Renewal Deadline, and Why Did It Move to December 28, 2026?
Monday, December 28, 2026. TCEQ issued the 2026 TXR050000 multi-sector general permit on July 22, 2026, effective August 14, 2026, which set the Part II, Section C(3) renewal deadline at November 12. On October 28, 2026, the Interim Executive Director extended it to December 28, citing a prolonged STEERS outage as good cause (TCEQ renewal deadline extension letter).
The written request TCEQ granted cited “the prolonged outage of the State of Texas Environmental Electronic Reporting System (STEERS), TCEQ’s electronic filing application, as good cause.” A statewide industrial permit renewal moved 46 days because the agency’s own single portal failed, which is a documented argument against treating one portal as a reliable path, written by the agency that runs it. TCEQ’s IT Maintenance Schedule showed no current outage as of this writing.
You file a renewal Notice of Intent (INOI-R) or No Exposure Certification (INEC-R) through STEERS/ePermits, with a $100 electronic fee or $200 on paper, and the $200 annual water quality fee under Texas Water Code 26.0291 follows the authorization (2026 MSGP, Part II, Section C.10). A facility that did not file a Notice of Termination before September 1, 2026 was already assessed the FY2027 fee. No benchmark sampling was required in 2026 because of the renewal, and 2026 results go through NetDMR by March 31, 2027. For what happens when the renewal date passes unfiled, see our post on industrial stormwater permit coverage.
This item also teaches how to read Texas sources. A pre-adoption TCEQ presentation says November 11, an agency newsletter says November 12, the program page says December 28, and TCEQ’s due dates page still shows TXR050000 expiring 8/14/21 when the 2026 fact sheet puts expiry at August 14, 2031. The hierarchy that resolves it: a signed executive director determination beats the permit text, the permit beats the program page, the program page beats a summary page. The recurring month-and-day items on the due dates page are reliable. The year-specific permit expirations on it are not.
Which Texas Agency Receives Tier II Reports, and Did the Program Move From DSHS to TCEQ?
TCEQ, and it has since September 1, 2015. House Bill 942, 84th Texas Legislature, transferred the Tier II program and all DSHS duties under the Texas Community Right-To-Know Acts to TCEQ (HB 942 Bill Analysis). TCEQ is the state repository and takes about 80,000 Tier II reports a year through STEERS (TCEQ, About the Tier II Chemical Reporting Program).
Any reference, template or generated answer built before 2016 routes a Texas Tier II filing to DSHS, and eleven years on that routing still shows up in multi-state matrices. Check your own binder.
DSHS kept a narrower role that is easy to mistake for Tier II: the Texas Hazard Communication Act, Texas Health and Safety Code (THSC) Chapter 502, a workplace chemical list, employee notice and training program with its own forms and posting duties (DSHS, Workplace Chemical List). That is worker right-to-know, not a community inventory filing. The fingerprint of the old arrangement survives in THSC 505.016(d), which still lets DSHS use up to 15 percent of Tier II fee revenue to administer Chapter 502 (THSC Chapter 505).
The split: Tier II to TCEQ through STEERS, Chapter 502 hazard communication to DSHS, production-side oil and gas to the RRC. For federal Tier II mechanics and thresholds, see our Tier II reporting deadline guide and multi-state Tier 2 reporting requirements.
The Texas Tier II Layer: A Fee, a 90-Day Clock and a 72-Hour Clock
The annual Texas Tier II report is due Monday, March 1, 2027 for calendar year 2026, with the window open January 1 to March 1 and the draft available from November 1 (TCEQ, Tier II Reports and Timelines). THSC 505.006(e-2) also requires a copy of the filed form to the fire chief with jurisdiction and to the local emergency planning committee.
How Much Does It Cost to File a Tier II Report in Texas?
$50 to $500 per facility, set by NAICS code and chemical count. Manufacturers in NAICS 31000 to 33000 pay $100 for 25 or fewer chemicals and rise by $100 a band to $500 at 101 or more. Non-manufacturing and public employer facilities pay $50 for 75 or fewer chemicals and $100 above that (TCEQ RG-533).
The fee is assessed automatically on submission and paid through ePay from the Report Detail page (TCEQ, Step 5: Paying Tier II Fees). Federal facilities pay nothing, and Deficiency Correction and Updated Reports carry no fee. Consolidated filing covers 2 manufacturing facilities for $100, 3 non-manufacturing for $50 or 7 public employer facilities for $50, under one operator, customer number and TXT2 account, in one draft report, capped at 24 reportable chemicals per facility.
One caveat on the document rather than the numbers: RG-533 is dated April 2021. The amounts match the statutory ceilings in THSC 505.016(b) exactly, and raising them would take legislation rather than a rulemaking, so cite the statute if a client’s counsel asks.
Does Texas Require a Tier II Update When a Chemical’s Weight Range Changes Mid-Year?
Yes, within 90 days. THSC 505.006(e-1), 506.006(d-1) and 507.006(e-1) each require an updated Tier II form no later than the 90th day after a change in a previously reported chemical’s 40 CFR Part 370 weight range. Federal EPCRA has no mid-year equivalent. The updated report carries no fee.
The same clock runs for a new facility and for a chemical that becomes reportable for the first time, under THSC 505.006(e). Neither has an annual cycle behind it: nothing arrives in the mail, and the trigger is an inventory change first noticed in purchasing or production rather than in EHS.
Two more floating clocks belong in the same list. Ammonium nitrate used in fertilizer runs on 72 hours under THSC 505.0061(c), added by HB 942 after the 2013 West, Texas explosion, with a parallel TCEQ duty to forward the form to the state fire marshal and the Texas Division of Emergency Management within 72 hours. THSC 505.007(b) requires the facility itself, not TCEQ, to furnish its workplace chemical list or a Tier II extract computed at a 500-pound threshold within 10 working days of a written public request. A facility fielding five requests in a month, four a month for two consecutive months, or more than 10 a year may elect to send the material to TCEQ instead.
The Texas Waste Layer: Class 1, Two Due Dates and an Eight-Character Code
What Is the Texas Industrial Class 1 Waste Registration Threshold, and Does It Apply With No Hazardous Waste on Site?
More than 100 kg per month, and yes, it applies on its own. 30 TAC 335.6(c) requires registration with TCEQ above 100 kg per month of non-acute hazardous waste, above 1 kg per month of acute hazardous waste, or above 100 kg per month of industrial Class 1 nonhazardous waste, per site.
That third trigger has no federal counterpart and is the widest net in Texas reporting. A plant generating no hazardous waste at all is a federal very small quantity generator with essentially no annual filing. In Texas, if it moves more than 100 kg a month of industrial Class 1 nonhazardous waste, it holds a Notice of Registration, owes an Annual Waste Summary, assigns an eight-character waste code to every stream, and gets a generation fee invoice in September. Count Class 1 volume against the 100 kg line before concluding federal generator status settles the question. For the federal VSQG, SQG and LQG framework, see our post on hazardous waste generator categories.
When Is the Texas Annual Waste Summary Due, and Why Are There Two Dates?
January 25 for paper filers and March 1 for electronic filers, under 30 TAC 335.9. The due date is set by filing medium, not by generator size, and large quantity generators must file electronically, so March 1 is their date (TCEQ, Industrial and Hazardous Waste Reporting).
A deadline that moves five weeks on filing medium is the kind of detail a flattened multi-state calendar collapses into one date. If a site switched from STEERS to paper, its deadline moved back to January 25, and nothing about the filing announces that.
The summary is due every year, including years the federal Biennial Report is not. 2027 is odd, so the Texas summary is still due Monday, March 1, 2027 for calendar year 2026. In 2028 a Texas LQG files the Biennial Report in EPA’s RCRAInfo and the Annual Waste Summary in STEERS on the same date, in two systems. A limited certification replaces the full summary for a generator under 1,200 kg of non-acute hazardous waste, under 1,200 kg of industrial Class 1 and under 1 kg of acute hazardous waste for the year, plus the volumes at 40 CFR 262.14(a)(3) and (4).
How Much Is the Texas Hazardous Waste Generation Fee, and When Is It Invoiced?
Nothing under 1 ton, $75 flat from 1 to 25 tons, then $3.00 per ton above 25 tons. Class 1 nonhazardous waste is free under 1 ton, $44 flat from 1 to 50 tons, then $0.88 per ton above 50 tons. TCEQ invoices generally in September, payable 30 days from the invoice date (TCEQ RG-038).
The fee is computed from the tonnage on your prior-year Annual Waste Summary, so the March filing sets the September invoice. 30 TAC 335.323 sets a floor of $50 a year and ceilings of $50,000 for hazardous and $10,000 for nonhazardous waste. Late payment draws 5 percent of the fee due, plus another 5 percent if still unpaid 30 days later.
How Is a Texas Waste Code Structured, and What Are the Reserved Prefixes?
Eight characters under 30 TAC 335.503: a four-character sequence number in positions 1 through 4, a three-digit form code in positions 5 through 7, and one classification character, H, 1, 2 or 3, in position 8. Registered generators assign their own sequence numbers from 0001 to 9999. The reserved prefixes are OUTS, VSQG, TSDF, PHRM, RRCT and UNIV.
This sits on top of the EPA waste codes on your manifests, and the classification character is where the Class 1 question gets answered stream by stream (TCEQ RG-22). RRCT is the prefix that catches people: waste arriving at a TCEQ-regulated site from an RRC-regulated facility takes RRCT rather than a facility sequence number.
Has Texas Adopted the Federal Hazardous Waste Generator Improvements Rule, and Is Texas Authorized for It?
Adopted yes, authorized no. EPA’s state tracker, last updated October 8, 2026, lists Texas as Yes for adopted and No for authorized on the 2016 Hazardous Waste Generator Improvements Rule (EPA, Where Is the Generator Improvements Rule in Effect?).
Keep those two words apart, because most summaries flatten them to “Texas has the rule.” Texas rules already use VSQG terminology and cite 40 CFR 262.14(a)(3) and (4) in 30 TAC 335.9, so the state text reflects the rule. Until EPA authorizes it, the federally enforceable program is still the pre-rule authorized text, so the state rule and the enforceable rule are not the same document. Texas received base RCRA authorization on December 26, 1984 (49 FR 48300) with at least sixteen revisions through 2009 (77 FR 13565) and a further revision effective March 5, 2021, in which EPA stated it would keep implementing and enforcing the HSWA provisions Texas is not authorized for (86 FR, March 5, 2021).
The Texas Air Layer: One Inventory Date, Two Fee Tracks, One Fee Not Yet Charged
When Is the Texas Annual Emissions Inventory Due and Who Has to File It?
March 31 of the year after the reporting year, through TCEQ’s STEERS-AEIR Web-EI system, under 30 TAC 101.10. Filers include 30 TAC 116.12 major sources, accounts at or above 100 tpy of any contaminant other than greenhouse gases, 10 tpy of a single hazardous air pollutant or 25 tpy of all HAPs, and 0.5 tpy of lead (TCEQ RG-360 Chapter 1).
In an ozone nonattainment area the thresholds drop to 10 tpy of volatile organic compounds, 25 tpy of nitrogen oxides, or 100 tpy of any other NAAQS contaminant. If no operating change produced at least a 5.0 percent or 5 tpy difference, whichever is greater, you file a certifying letter instead.
Two details get missed. The inventory obligation is broader than the fee obligation, so a Texas account can owe the March 31 inventory under 30 TAC 101.10 and owe no emissions fee at all, because the fee under 30 TAC 101.27 reaches only federal operating permit accounts. And a submission is not timely until the file validates: TCEQ’s position is that the inventory is not late as long as the file is validated by the due date, so a file submitted March 31 that fails validation on April 2 is late. Compliance is required whether or not TCEQ sends a notification letter.
What Does a Texas Air Emissions Fee Cost per Ton, and Who Pays It Instead of the Inspection Fee?
$76.60 per ton for fiscal year 2026, capped at 4,000 tons per regulated pollutant per account, under 30 TAC 101.27 and THSC 382.0621. Title V accounts pay it. Non-Title V sites in listed SIC codes pay the annual emissions inspection fee instead, $1,503.60 to $44,911.10 across 158 capacity tiers for FY2026. A site subject to both pays only the greater (TCEQ, Air Fees).
The fee basis form is due June 1, the invoice issues on or about October 31, and payment must clear by November 30. There is no proration: the fee is owed for the full fiscal year if the account operated at any time during it, and the only waiver under 30 TAC 101.27 is written notice that the account will not operate that year.
This rate has gone down before and is not currently scheduled to rise, which cuts against the usual framing. TCEQ’s published history shows it falling from $55.84 per ton in FY2019 to $53.34 in FY2020, and the FY2027 rate is published flat at $76.60 and marked “pending update” (TCEQ, Air Emissions Fee Rates). Treat FY2027 as preliminary. No TCEQ page or Texas Register notice located for this post proposes a 2027 increase to Texas air, Tier II, waste generation, TRI or stormwater fees.
When Must a Texas Major Source Submit Its Clean Air Act Section 185 Baseline Amount?
The later of the emissions inventory due date for the baseline year or 120 days after the effective date of EPA’s finding of failure to attain, under 30 TAC 101.705. With calendar year 2027 as the baseline year for Dallas-Fort Worth and Houston-Galveston-Brazoria, that is March 31, 2028 at the earliest (TCEQ, Section 185 Failure to Attain Penalty Fee, May 20, 2026).
The number attached to this program is $12,850.67 per ton of ozone precursor above baseline, at the 2025 EPA inflation-adjusted rate, for major sources at 25 tpy of actual or potential VOC or NOx. The number is real. Anyone telling a Houston plant manager flatly that the fee is coming in 2027 is overselling it, and the agency’s own presentation is why. TCEQ adopted the rulemaking on October 22, 2025, submitted it to EPA on November 7, 2025, and the program was not implemented upon adoption. It becomes applicable only when an EPA finding of failure to attain takes effect, which cannot precede the July 20, 2027 attainment date. The rule then carries offsets that can zero the obligation: TCEQ credits each area’s total fee against annual grant revenue collected from that area, prorates any remainder across major sources, and lets a site offset with emissions reduction credits or portions of supplemental environmental projects. The Executive Director can suspend collection on three years of clean monitoring data or a Clean Air Act Section 179B international-emissions demonstration.
The baseline arithmetic is worth doing now, because it is built from 2027 emissions and cannot be reconstructed later. The baseline is the lower of total annual routine emissions reported in the inventory, including authorized and reported maintenance, startup and shutdown emissions, or total authorized and pending authorized emissions, across all units on site as of December 31, 2027. Sources with irregular or cyclic emissions may elect a consecutive 24-month historical period instead. For whether your site is in scope and for the county lists, see our post on Texas ozone nonattainment air permitting requirements.
Does Texas Charge a State Fee for Filing TRI Form R, and Is There a Separate State Deadline?
Yes to both. THSC 370.003(c) requires the toxic chemical release form be submitted to the TCEQ executive director no later than July 1 each year, and THSC 370.008 sets a $25 fee per form with a $250 maximum per facility. TCEQ invoices those fees around January 31, payable 30 days from the invoice date (THSC Chapter 370).
A Texas TRI reporter runs two filings and one invoice: the federal Form R to EPA, the state submission to TCEQ by July 1, and a TCEQ invoice in January unrelated to EPA. The $25 and the $250 cap are statutory, which matters because the TCEQ guidance carrying them, RG-013, is dated August 2008, so cite THSC 370.008. Chapter 370 was last amended by SB 766, 89th Legislature, effective September 1, 2025, touching only the definitions in 370.002. For what triggers a Form R, see our post on the Toxics Release Inventory.
Who Must File a Texas Pollution Prevention Annual Progress Report and When?
TRI Form R filers and hazardous waste large quantity generators, by July 1 each year for the previous calendar year, under 30 TAC 335.476. The STEERS window opens May 15, and companies reporting for 10 or more facilities must use STEERS (TCEQ, P2 Annual Progress Reports).
Small quantity generators that do not file a Form R prepare a pollution prevention plan and submit its Executive Summary, but file no annual progress report. The Executive Summary of the Five-Year Pollution Prevention Plan is due January 1 of the applicable fifth year, and a revised summary with a new certification of completeness and correctness is due within 30 days of any plan revision. Executive Summaries cannot go through STEERS: they go by email or mail to the TCEQ pollution prevention team. Nothing federal requires either the plan or the report.
What Is the Maximum Civil Penalty TCEQ Can Assess per Day, and Why Is the Tier II Number So Much Lower?
$25,000 a day per violation under Texas Water Code 7.052(c), rising to $40,000 a day only when three aggravating conditions all apply. Section 7.052(b-4) caps a THSC Chapter 505 manufacturing Tier II violation at $500 a day and $5,000 total per violation, and a Chapter 506 or 507 violation at $50 a day and $1,000 total (Texas Water Code Chapter 7).
Texas penalty authority is consolidated: one chapter covers air, water and waste within TCEQ’s jurisdiction. The $40,000 tier is rare because it requires all three conditions together: an actual release above protective levels or an unauthorized diversion of state water with specified harms, a prior violation of the same nature that drew an administrative penalty, and a commission determination that the violation could reasonably have been anticipated and avoided. Section 7.052(d) lets each day of a continuing violation stand as a separate violation, and an unpermitted rock crusher or concrete plant carries a fixed $10,000 under 7.052(b).
The gap inside that same statute is worth stating against our own interest. A Texas Tier II violation tops out at $500 a day and $5,000 total, one to two orders of magnitude below the general ceiling and far below the federal EPCRA Section 312 ceiling of $71,545 per violation per day as adjusted at 40 CFR 19.4. Any pitch implying that Texas Tier II exposure is the frightening number is wrong on the statute. In Texas the Tier II risk is the federal penalty and the operational consequence of a wrong chemical inventory in a fire chief’s hands, not the state fine.
The Full Texas Reporting Calendar for 2027
2027 weekdays verified. 2027 is an odd year, so the federal Biennial Report is not due and the Texas Annual Waste Summary is due anyway.
| Due Date | Filing | Who Files | Agency, Portal, Citation |
|---|---|---|---|
| Mon, Dec 28, 2026 | TXR050000 renewal NOI or NEC, $100 electronic | MSGP permittees | TCEQ, STEERS/ePermits |
| Jan 1, 2027, fifth year | Five-Year P2 Plan Executive Summary | P2 plan preparers | TCEQ P2 team, not STEERS; 30 TAC 335.476 |
| Mon, Jan 25, 2027 | Annual Waste Summary, paper, Form TCEQ-00436 | Paper filers | TCEQ; 30 TAC 335.9 |
| Jan 31, 2027 invoice | TRI fees, $25 per Form R, $250 cap, due in 30 days | Texas TRI reporters | TCEQ; THSC 370.008 |
| Mon, Mar 1, 2027 | Tier II report plus filing fee | Over EPCRA 312 thresholds | TCEQ, STEERS, fee via ePay; THSC 505 to 507 |
| Mon, Mar 1, 2027 | Annual Waste Summary, electronic, required for LQGs | Registered generators | TCEQ, STEERS; 30 TAC 335.9 |
| Mon, Mar 1, 2027 | Water Use Survey | Notified water users | TWDB; Water Code 16.012(m) |
| Mon, Mar 1, 2027 | Annual water use report, surface water right | Water rights holders | TCEQ, SUNSS |
| Wed, Mar 31, 2027 | Annual emissions inventory, RY2026 | 30 TAC 101.10 accounts | TCEQ, STEERS-AEIR |
| Wed, Mar 31, 2027 | Benchmark report and effluent limit DMRs | TXR050000 permittees | TCEQ, NetDMR; 2026 MSGP Part III |
| Wed, Mar 31, 2027 | CAFO annual report | Animal feeding operations | TCEQ |
| Tue, Jun 1, 2027 | Air emissions and inspection fee basis forms | Title V, listed SIC codes | TCEQ |
| Thu, Jul 1, 2027 | Texas toxic chemical release form | Texas TRI reporters | TCEQ executive director; THSC 370.003(c) |
| Thu, Jul 1, 2027 | P2 annual progress report, window opens May 15 | Form R filers, LQGs | TCEQ, STEERS; 30 TAC 335.476 |
| Thu, Jul 1, 2027 | Consumer Confidence Report, certificate of delivery | Community water systems | TCEQ, STEERS PDW |
| Tue, Jul 20, 2027 | DFW and HGB severe ozone attainment date | Major VOC, NOx sources | EPA finding; 30 TAC 101.705 |
| Wed, Sep 1, 2027 | Annual water quality fees assessed | General permit holders | TCEQ; Water Code 26.0291 |
| Sep 2027 typical | Waste generation fee invoiced, due in 30 days | Hazardous, Class 1 generators | TCEQ; 30 TAC 335.323 |
| Oct 31, 2027 invoice | Air emissions and inspection fees, due in 30 days | Title V, listed SIC codes | TCEQ; 30 TAC 101.27 |
| Tue, Nov 30, 2027 | Air fees paid in full | Same | TCEQ |
| Thu, Dec 30, 2027 | Stormwater water quality fees invoiced | Stormwater permittees | TCEQ |
| Wed, Mar 1, 2028 | Annual Waste Summary plus federal Biennial Report | LQGs, TSDFs | STEERS and RCRAInfo; 30 TAC 335.9 |
| Fri, Mar 31, 2028 | Section 185 baseline, or 120 days after EPA’s finding | DFW, HGB major sources | TCEQ; 30 TAC 101.705 |
| Aug 14, 2031 | TXR050000 expires | MSGP permittees | TCEQ |
Five Texas obligations float rather than sit on a date, and all five appear above: the 90-day Tier II update, the 72-hour ammonium nitrate report, the 10-working-day citizen response, the Title V annual compliance certification due within 30 days of each 12-month period under 30 TAC 122.146, and the MSGP annual comprehensive site compliance inspection report, due within 30 days of the inspection and kept with the stormwater pollution prevention plan. Underground storage tank owners also renew the delivery certificate at least 30 days before expiration and file an annual self-certification with proof of financial assurance. For what goes into a Title V certification, see our post on Title V compliance certification.
Which Portal Handles Which Texas Filing?
STEERS takes the emissions inventory, Tier II, the waste Notice of Registration and summaries, air compliance reports, maintenance and startup events, emissions banking, pollution prevention planning, public drinking water, municipal solid waste quarterly reports, stack tests and training rosters. NetDMR takes TPDES discharge monitoring reports, including MSGP benchmark data, and since June 24, 2021 it takes oil and gas DMR data on the TCEQ instance rather than EPA Region 6. STEERS/ePermits takes the stormwater NOI, NEC, NOC and NOT. SUNSS, with separate credentials, takes surface water rights reporting. ePay takes the Tier II fee. RCRAInfo still takes the federal Biennial Report in even years, and the TWDB survey application stands outside all of it. A site that files Tier II and waste summaries in STEERS still needs SUNSS access for its water right report, and setting that up in January rather than late February is the difference between four filings and a scramble.
Where the TCEQ, DSHS and Railroad Commission Lines Fall
TCEQ takes air, water, waste, Tier II under THSC 505 to 507, the state TRI submission and pollution prevention planning. DSHS takes only Chapter 502 workplace hazard communication. The RRC takes exploration, development and production wastes, field treatment wastes, crude oil tank bottoms before the refinery gate, underground hydrocarbon and gas storage wastes, pipeline wastes to the refinery gate, reclamation plant wastes, oil and gas NORM, stormwater from RRC-regulated sites, and Class II, III and V injection wells, under the memorandum of understanding at 30 TAC 7.117 (TCEQ, Oil and Gas Activities).
Four traps follow from that split. A production site’s stormwater is not covered by TXR050000, and where one physical site falls partly under each agency, each authorizes stormwater for its own portion, so one site can need two authorizations. Enforcement follows the generating activity rather than the facility. Hazardous wastes from gasoline, gas processing and pressure maintenance plants stay with TCEQ until the RRC receives EPA authorization under RCRA, which it never has. And Class I injection wells are TCEQ while Class II are RRC, covered in our post on Class I underground injection control permits. Texas was also never authorized for NPDES in Indian Country, where EPA retains permitting and primary enforcement (63 FR 51164).
Texas Charges per Ton of Waste and Nothing per Tank
Bigger state, bigger fees is the natural assumption, and on tanks it is backwards. 30 TAC 334.21(a) provides that annual storage tank facility fees ceased to be assessed effective September 1, 2007 and will not resume until the commission reinstates them, and TCEQ states plainly that owners are no longer charged registration fees (TCEQ, Petroleum Storage Tanks: Am I Regulated?). Nineteen years with the rule text on the books and the fee at zero. The annual duties survived the fee, which is the real risk: the delivery certificate renewal and the self-certification come due every year, on a floating date, with no invoice to prompt anyone.
| Obligation | Texas | Kansas |
|---|---|---|
| Annual UST fee | $0 since September 1, 2007 | $25 per tank |
| Annual AST fee | $0; registration above 1,100 gallons | $10 per tank |
| Hazardous waste generator fee | $0 under 1 ton, $75 to 25 tons, then $3.00 per ton | $150 SQG, $300 to $8,000 LQG, no tonnage floor |
| Second nonhazardous waste class | Industrial Class 1, above 100 kg per month | None |
| State TRI fee | $25 per form, $250 cap | $250 to $3,000 per report year |
| Fourth generator category | None; federal VSQG, SQG, LQG | KSQG, 25 to 100 kg per month |
A plant with twelve underground tanks and a 40-ton hazardous waste stream pays nothing in Texas tank fees and about $120 in generation fees on that stream. The same plant in Kansas pays $300 in tank fees plus a monitoring fee set by tonnage. Our Kansas environmental reporting calendar carries the Kansas side in full, including the KSQG tier that has no Texas or federal equivalent.
What a Missed Texas Deadline Costs Automatically
Statutory ceilings need an enforcement action. The penalties below need nothing but a missed date.
| Missed Deadline | Automatic Consequence |
|---|---|
| Air emissions or inspection fee past the invoice due date | 5 percent of the fee, 5 percent more after 30 days, then interest at prime plus 1 percent after 60 days (TCEQ RG-397) |
| Waste generation or TRI fee past the invoice due date | 5 percent, plus 5 percent more after 30 days, with interest after 60 days on the TRI fee |
| Billing dispute raised more than a year after payment in full | TCEQ may not adjust the amount due |
| MSGP renewal NOI or NEC not filed by the deadline | Coverage expires 90 days after the permit effective date; new coverage needs a fresh NOI or NEC |
| Emissions inventory not submitted or not validated | Enforcement under Texas Water Code Chapter 7, with or without a notification letter |
Building a Texas Reporting Calendar That Holds
The pattern across every item above is the same. A Texas-specific date, dollar amount, portal or agency sits on top of a federal framework that, by itself, would tell a facility it owes nothing. The Class 1 trigger, the annual waste summary in non-biennial years, the two dates set by filing medium, the eight-character waste code, the Tier II fee and its 90-day and 72-hour clocks, the state TRI submission, the pollution prevention report, the emissions inspection fee and the two March 1 water filings exist only because Texas went further than RCRA, EPCRA and the Clean Air Act require.
There is good Texas consulting material on air permitting strategy, Title V, new source review and dispersion modeling, and some of the best of it is written in Texas. What a gated state summary cannot carry is the part a reader needs on a given Tuesday: the exact dollar amount, the portal, the specific date, and which of three agencies receives the filing, checked against the agency’s own documents this month. A December 28, 2026 deadline created by a letter dated October 28, 2026 is in no summary written before November.
iSi Environmental’s compliance program management tracks this Texas layer alongside the federal calendar, which in practice means STEERS, NetDMR, SUNSS and ePay get the same attention as RCRAInfo and EPA’s systems, and the floating clocks get a reminder even though no agency sends one. If you are not sure whether your site’s monthly industrial Class 1 volume crosses the 100 kg line in 30 TAC 335.6(c), or which of these filings your site already owes, talk to an environmental compliance team that tracks both calendars for a living.
Sources
- TCEQ, MSGP TXR050000 Renewal Deadline Extension, October 28, 2026 (verified 2026-11-23)
- TCEQ, 2026 Multi-Sector General Permit TXR050000 (verified 2026-11-23)
- TCEQ, 2026 MSGP Fact Sheet (verified 2026-11-23)
- TCEQ, Stormwater Multi-Sector General Permit for Industrial Facilities (verified 2026-11-23)
- TCEQ, About the Tier II Chemical Reporting Program (verified 2026-11-23)
- TCEQ, Step 1: Types of Tier II Reports and Timelines (verified 2026-11-23)
- TCEQ, Step 5: Paying Tier II Fees (verified 2026-11-23)
- TCEQ RG-533, Texas Tier II Chemical Reporting Fee Schedule, April 2021 (verified 2026-11-23)
- TCEQ, Industrial and Hazardous Waste Reporting (verified 2026-11-23)
- TCEQ RG-038, Waste Generation Fee, August 2023 (verified 2026-11-23)
- TCEQ RG-22, Classification and Coding of Industrial and Hazardous Waste (verified 2026-11-23)
- TCEQ RG-360 Chapter 1, Emissions Inventory Guidelines (verified 2026-11-23)
- TCEQ, Air Fees (verified 2026-11-23)
- TCEQ, Air Emissions Fee Rates, updated 08/01/2026 (verified 2026-11-23)
- TCEQ, Emissions Inspection Fee Schedule for Fiscal Year 2026 (verified 2026-11-23)
- TCEQ RG-397, Air Emissions Fee (verified 2026-11-23)
- TCEQ RG-013, Toxics Release Inventory Reporting Fee (verified 2026-11-23)
- TCEQ, Section 185 Failure to Attain Penalty Fee, Environmental Trade Fair, May 20, 2026 (verified 2026-11-23)
- TCEQ, P2 Annual Progress Reports (verified 2026-11-23)
- TCEQ, Petroleum Storage Tanks Registrations: Am I Regulated? (verified 2026-11-23)
- TCEQ, Electronic Reporting (verified 2026-11-23)
- TCEQ, Reporting, Fee, and Renewal Due Dates to Remember (verified 2026-11-23)
- TCEQ, Oil and Gas Activities (verified 2026-11-23)
- TCEQ, IT Maintenance Schedule (verified 2026-11-23)
- TCEQ, Air Permits Fact Sheet (verified 2026-11-23)
- Texas Administrative Code, Texas Secretary of State TAC viewer: 30 TAC 101.10, 30 TAC 101.27, 30 TAC 122.146, 30 TAC 334.21, 30 TAC 335.6, 30 TAC 335.9, 30 TAC 335.323, 30 TAC 335.476, 30 TAC 335.503, 30 TAC 7.117 (verified 2026-11-23)
- Texas Health and Safety Code Chapter 370, Toxic Chemical Release Reporting (verified 2026-11-23)
- Texas Health and Safety Code Chapter 505, Manufacturing Facility Community Right-To-Know Act (verified 2026-11-23)
- Texas Health and Safety Code Chapter 506, Public Employer Community Right-To-Know Act (verified 2026-11-23)
- Texas Health and Safety Code Chapter 507, Nonmanufacturing Facilities Community Right-To-Know Act (verified 2026-11-23)
- Texas Water Code Chapter 7, Enforcement, including Section 7.052 (verified 2026-11-23)
- Texas Legislature Online, HB 942 Bill Analysis, 84th Legislature (verified 2026-11-23)
- Texas Water Development Board, Water Use Survey (verified 2026-11-23)
- DSHS, Hazard Communication: Workplace Chemical List (verified 2026-11-23)
- Railroad Commission of Texas, Environmental Permit Types: Discharges (verified 2026-11-23)
- RRC and EPA Region 6, Class VI UIC Program Memorandum of Agreement, Addendum 1 (verified 2026-11-23)
- EPA, Where Is the Hazardous Waste Generator Improvements Rule in Effect? (verified 2026-11-23)
- Federal Register, 86 FR (March 5, 2021), Texas Final Authorization of State Hazardous Waste Management Program Revision (verified 2026-11-23)
- Federal Register, 77 FR 13565 (March 6, 2012), Texas Final Authorization of State Hazardous Waste Management Program Revision (verified 2026-11-23)
- Federal Register, 63 FR 51164 (September 24, 1998), Texas NPDES Program Approval (verified 2026-11-23)
- 40 CFR 19.4, Civil monetary penalty inflation adjustments (verified 2026-11-23)
- OSHA, State Plans (verified 2026-11-23)