Subpart GG or 6H: Which Air Toxics Rule Governs Your Aerospace Coating Line
Subpart GG applies only to aerospace facilities that are major sources of HAP. Below 10 and 25 tons per year, Subpart 6H governs instead. Here is how to run the test.
Industry news, compliance guidance, and best practices from iSi Environmental's expert team
Subpart GG applies only to aerospace facilities that are major sources of HAP. Below 10 and 25 tons per year, Subpart 6H governs instead. Here is how to run the test.
Chrome plating and anodizing fall under 40 CFR 63 Subpart N even at area sources. The rest of the shop falls under 6W. How to tell which rule covers which tank.
A water loss in a Kansas commercial building raises one question above all others: what has to happen before people can use the space again. The answer is not a regulatory number, because no federal mold standard exists.
EPA's RRP rule does not cover most commercial or industrial buildings. Here is what governs a plant renovation instead: OSHA 29 CFR 1926.62 and RCRA waste testing.
There is no federal mold standard and no legal limit for airborne mold. Here is what air, surface and bulk samples establish in a commercial building, what they cannot establish, and the three situations where sampling is worth the money.
OSHA's construction lead standard presumes exposure for named demolition, blasting and torch-cutting tasks and demands full protection on day one, before any lab result exists.
A new spray booth usually needs state pre-construction authorization before install. Run the potential to emit math, then check the trigger in six states.
A stainless or chrome-alloy changeover triggers additional exposure monitoring under 29 CFR 1910.1026(d)(2)(vi). What that means for Cr(VI), manganese, and who gets sampled.
Colorado's ECMC takes over Class VI carbon storage well permits on November 12, 2026. Here is what OSHA still requires at your CO2 capture and compression skid.
Missouri narrowed its construction permit exemption for emergency generators on January 30, 2026. One generator still qualifies. Two or more is a calculation.
EPA flagged monitors in Sedgwick and Wyandotte counties under the 9.0 ug/m3 PM2.5 standard. Kansas designations go final February 6, 2027. What changes.
OSHA has no lightning standard. The exposure sits in how you handle the worker who stops for thunder, and in what your written weather plan actually says.
Houston and Dallas Fort Worth sit in two ozone nonattainment classifications at once, so the binding air permitting threshold is 25 tpy of VOC or NOx, not 50.
EPA's September 2026 gasoline distribution NESHAP reconsideration reopened control-device rules and left the May 8, 2027 first LDAR survey date in place.
Kansas publishes no numeric stream phosphorus criterion, so a revised Lower Arkansas TMDL sets the wasteload allocation your next NPDES renewal must match.
OSHA Fact Sheet 4519 recommends stocking opioid overdose reversal medications. No OSHA standard requires naloxone. Here is what your first aid program owes.
EPA's September 2026 notice asks whether LEAF leaching methods could support an alternative to TCLP testing for industrial landfill waste. Nothing changes yet.
EPA's final Title V applicable requirements rule is effective October 26, 2026. NSR permit terms become final only where a permit had public notice and comment.
EPA's September 2026 WOTUS supplemental proposal would define relatively permanent waters as perennial, with a single 30-day dry period. Comments close October 9.
Federal OSHA gives you fifteen working days to explain a delay, not to produce the record. California gives fifteen calendar days, hard. Here is the difference.
OSHA requires eight specific elements in a laboratory chemical hygiene plan, plus an annual effectiveness evaluation most labs cannot evidence. All eight here.
Class I injection well permitting, state by state: a different agency in Kansas, Oklahoma, Texas and Nebraska, EPA direct in Colorado, and banned in Missouri.
If your plant, school, or campus runs its own well, federal lead service line inventory rules already apply. EPA is enforcing now. Here is how to check.
NPL deletion is a rulemaking. What a buyer, lender, or developer has to verify on a delisted or partially delisted Superfund parcel before closing.