Missouri Environmental Deadlines: The MDNR and MERC Reporting Calendar a Federal List Misses
Missouri's hazardous waste year runs July 1 to June 30. Here are the MDNR and MERC deadlines, fees, and portals a federal compliance calendar leaves out.
If your compliance calendar starts with the federal dates, you have Tier II in the first quarter, Form R on July 1, and the RCRA Biennial Report on its even-year cycle. What that list does not have is the Missouri layer underneath it. Missouri splits environmental reporting across two departments, runs its hazardous waste fee and report clock on a fiscal year that does not match the federal one, routes filings through five portals, and charges for hazardous waste by the ton instead of by a flat annual fee. This calendar covers the Missouri Department of Natural Resources (MDNR) and Missouri Emergency Response Commission (MERC) deadlines, with the citation behind every date. For the federal dates underneath, start with our EHS compliance calendar. For the state next door, which went the other direction on almost every point below, see the Kansas reporting calendar.
Why Missouri’s Reporting Year Starts on July 1, Not January 1
Of everything a federal calendar gets wrong about Missouri, this costs the most. Missouri’s hazardous waste reporting year runs July 1 through June 30. The annual Generator’s Hazardous Waste Summary Report is due August 14 following that year, and the in-state waste fee is calculated on tons generated in the twelve months ending the previous June 30 (10 CSR 25-12.010(3)(B), (5)(B)). Federal RCRA has neither shape. A facility that pulls January through December tonnage to check a Missouri invoice is answering a different question than the state asked.
Billing runs on a third rhythm. MDNR issues the generator registration renewal bill and the commercial treatment, storage, and disposal facility inspection fee bill by December 1, with payment on the fee stack due on or before January 1 (10 CSR 25-12.010(2)(A)-(B)). A Missouri generator pays in January on tonnage measured through the previous June and reports in August on the year that closed in June. Three dates, one program, none of them December 31.
The money is a stack: an annual registration renewal fee of $500 for a large quantity generator (LQG) or $150 for a small quantity generator (SQG) or conditionally exempt small quantity generator, an in-state waste fee of $200 for the first ton plus $6.10 per additional ton or portion capped at $57,000 per generator site per year, a land disposal fee of $29.50 per ton with no fee below 10 tons land disposed, a statutory off-site transportation fee of $2 per ton, and a 2 percent tax on gross charges for disposal at a hazardous waste landfill (10 CSR 25-12.010(1)(E), (5); MDNR, Hazardous Waste Fees). A site shipping 200 tons a year owes roughly $1,414 in the in-state waste fee alone, on a January 1 date no federal list carries. Waste discharged to a permitted municipal wastewater treatment plant is exempt from that fee, which is worth checking before paying.
Which Agency Receives Tier II Reports in Missouri?
The Missouri Emergency Response Commission (MERC), housed in the Department of Public Safety and staffed by the State Emergency Management Agency (SEMA), receives Missouri Tier II filings at apps1.mo.gov/MERC between January 1 and March 1. Not MDNR. Copies also go to the Local Emergency Planning Committee and the local fire protection service under section 292.605, RSMo.
The rule text says where this sits: Missouri’s Tier II fee rules sit at 11 CSR 40-4, a Title 11 Public Safety chapter, with the fee statute at section 292.606, RSMo (MERC fee worksheet instructions). Tier II leaves the environmental organization chart entirely. Three recipients means three deliveries, the form must list at least two individuals reachable in an emergency, and updates are due within three months of a facility obtaining reportable amounts of a hazardous chemical (MERC, How to Comply with EPCRA).
Fee amounts are in the table below. Two provisions are easy to miss: local governments and family-owned farm operations are exempt from the fee but still file a signed fee sheet, and a seller or transporter whose petroleum revenues exceed 50 percent of hazardous chemical revenues may deduct federal hazardous materials fees from the Missouri fee, owing Missouri nothing if the federal fees equal or exceed the state amount (section 292.606, RSMo). Our multi-state Tier II guide carries the state-by-state fee comparison.
Which Portal Handles Which Missouri Environmental Filing?
MoGEM at apps5.mo.gov/mogems is the account layer. MoRCRA inside it takes the hazardous waste summary and facility reports. MoEIS takes the air emissions annual report. MERC at apps1.mo.gov/MERC takes Tier II. EPA’s RCRAInfo takes the federal Biennial Report, and TRI-MEweb takes Form R. Five logins, one calendar.
Two pairings confuse people every year. MoGEM, the Missouri Gateway for Environmental Management, is not a filing system; it is the account and access layer, and MoRCRA is the hazardous waste program inside it (MDNR, Hazardous Waste Reporting). A facility with a MoGEM login may still not have MoRCRA access provisioned for the right site. The second is Tier II, which is not in MoGEM at all.
Missouri’s Recurring Deadlines, in One Table
2027 weekdays were verified against the calendar. Several land on a weekend, and neither MDNR nor MERC rules uniformly provide a next-business-day rollover, so confirm the operative date with the agency.
| Due Date | Filing or Payment | Who | Agency or Portal | Citation |
|---|---|---|---|---|
| Tue, Dec 1, 2026 | MDNR issues bills for the generator registration renewal fee and the commercial TSD inspection fee | Registered generators; commercial TSD facilities | MDNR Waste Management | 10 CSR 25-12.010(2), 25-12.020(3) |
| Fri, Jan 1, 2027 | In-state waste fee, land disposal fee, out-of-state waste fee ($2 per ton), TSD annual permit fee ($1,000), commercial TSD inspection fee ($9,800 to $12,000) | Generators; Missouri TSD facilities | MDNR Waste Management | 10 CSR 25-12.010(5), (7)(C); 25-12.020(3) |
| Jan 1 to Mon, Mar 1, 2027 | Missouri Tier Two form and fee: $100 per employer, $50 petroleum retail, $20 per chemical above three, $250 per county for pipelines, $10,000 annual cap | Facilities over EPCRA 312 thresholds; holders of 100 lb or more of explosives | MERC, plus the LEPC and fire protection service | MERC; 292.606 RSMo |
| Thu, Apr 1, 2027 (paper) or Sat, May 1, 2027 (MoEIS) | Air Emissions Annual Report for CY2026; April 1 is also the deadline for a no-production or out-of-business notice | Installations with a Permit by Rule, construction permit, or operating permit | MDNR Air Pollution Control, via MoEIS | 10 CSR 10-6.110; MDNR |
| Fri, May 14, 2027 | Quarterly Generator’s Hazardous Waste Summary Report | LQGs electing electronic quarterly reporting | MDNR via MoRCRA | 10 CSR 25-12.010(3)(F) |
| Tue, Jun 1, 2027, then Jun 1 each year | Air emission fee and base fee for the prior calendar year, at $60 per ton for CY2026 and $62 for CY2027 | Fee-subject installations | MDNR Air Pollution Control | MDNR, Air Emission Fees |
| Thu, Jul 1, 2027 | TRI Form R for RY2026, filed with EPA; no Missouri state fee | TRI reporters | EPA TRI-MEweb; MDNR receives data via EPA CDX | MERC, EPCRA guide |
| Sat, Aug 14, 2027 (weekend) | Generator’s Hazardous Waste Summary Report (MO 780-1097) for the Jul 2026 to Jun 2027 year, plus the Apr to Jun quarterly report | Generators whose MoRCRA site page shows a report button | MDNR via MoRCRA | 10 CSR 25-12.010(3)(B), (3)(F) |
| Sun, Nov 14, 2027 and Mon, Feb 14, 2028 | Quarterly reports for the Jul to Sep and Oct to Dec 2027 quarters | LQG quarterly electors | MDNR via MoRCRA | 10 CSR 25-12.010(3)(F) |
| Wed, Mar 1, 2028 | Federal RCRA Biennial Report covering CY2027 | TSD facilities, LQGs, handlers of hazardous secondary material | EPA RCRAInfo | MDNR, HW Reporting |
| Floats: 6 to 18 months before expiry | Air operating permit renewal application, 5-year term | Part 70 and intermediate installations | MDNR Air Pollution Control | 10 CSR 10-6.065(5), (4) |
| Floats: permit anniversary | Water operating permit annual fee, non-prorated | Water permittees | MDNR Water Protection | 10 CSR 20-6.011(2), (3)(A) |
| Floats: within 30 days | UST registration, $75 per tank, on putting a tank into operation or on an ownership change | UST owners and operators | MDNR Storage Tank program | 10 CSR 26-2.022 |
| Floats: within 3 months | Tier II update after obtaining reportable amounts of a hazardous chemical | Any facility crossing a threshold mid-year | MERC, LEPC, fire protection service | MERC, EPCRA guide |
| Floats: within 24 hours | Explosives or blasting agents over 100 lb on site, notice to the fire department | Any Missouri facility | Local fire protection service | MERC Tier Two Instructions |
| 2029, next cycle | Intermediate installation Full Emissions Report, on a 2020, 2023, 2026, 2029 cadence | Intermediate permit holders | MDNR via MoEIS | 10 CSR 10-6.110 Table 4 |
March 1, 2027 is not a federal Biennial Report date. That report covers odd-numbered years and is filed in the following even year, so the next one is March 1, 2028 (MDNR, Hazardous Waste Reporting). We cover that filing and who owes it in our biennial report post.
How Much Is Missouri’s Hazardous Waste Generator Registration Renewal Fee?
$500 for a large quantity generator and $150 for a small quantity generator or conditionally exempt small quantity generator, under 10 CSR 25-12.010(1)(E)1. MDNR issues renewal bills by December 1 for the next calendar year registration period. Nonpayment inactivates the registration, and reactivation costs the renewal fee plus a 15 percent late fee.
Federal RCRA has no generator registration fee of any kind. Kansas charges a monitoring fee tiered by prior-year tonnage instead, so a Missouri site pays on two mechanics where a Kansas site pays on one. Reactivation also requires an updated Notification of Regulated Waste Activity form, and unpaid fees or taxes generally can support inactivation after notice (10 CSR 25-12.010(2)(D)-(H)). A generator that first registers between October 1 and December 31 pays the initial fee and skips the following year’s renewal.
The failure mode is a billing failure, not a compliance failure. A $150 SQG renewal bill arrives in December addressed to an accounts payable contact who left in October, the registration goes inactive in the spring, and the problem surfaces on a loading dock when a transporter cannot complete a manifest against an inactive identification number. A $10,000 per day statutory ceiling is theoretical for almost every generator. A $150 invoice that turns off the EPA identification number is not. Keep a named person at the facility on the MDNR billing record.
Does Missouri Still Require an Annual State Hazardous Waste Report?
Not for most generators. MDNR states that “for most waste generators, the hazardous waste reporting requirements have been removed,” beginning with the July 1, 2025 to June 30, 2026 reporting year, because “the department is able to access the U.S. Environmental Protection Agency’s (EPA) E-Manifest data” (MDNR, Hazardous Waste Reporting). Check MoRCRA inside MoGEM: no report button means no state reporting requirement.
The reports still exist in rule at 10 CSR 25-12.010(3). What changed is who files them, and MDNR made that determination site-specific. Use the instruction as written: log into MoGEM at apps5.mo.gov/mogems, open MoRCRA, go to your site page, and look for a Generator’s Hazardous Waste Summary Report button or a Facility Summary Report button. MDNR’s language is “if your site page does not have either of these buttons, then you have no state reporting requirements.” Screenshot the page, note the date, and file it.
If a button appears, the annual filing is Form MO 780-1097, Generator’s Hazardous Waste Summary Report Part 1, due August 14 following the July to June reporting year. Hazardous waste facilities file Form MO 780-0408, the Facility Summary Report, covering both on-site generated and off-site received waste (10 CSR 25-12.010(3)(B), (4)). Past-due reports cannot be filed electronically; MDNR requires the paper PDF with a manual ink signature. Failing to file a report that does apply still carries the inactivation risk (10 CSR 25-12.010(3)(H)).
When Are Missouri Quarterly Hazardous Waste Reports Due?
May 14, August 14, November 14, and February 14, each 45 days after the quarter ends, under 10 CSR 25-12.010(3)(F). Only large quantity generators filing electronically may elect quarterly reporting. The annual alternative, the Generator’s Hazardous Waste Summary Report, is due August 14 for the July 1 to June 30 reporting year.
The election trades one date for four, easy to miscount on a July to June year. August 14 is both the fourth-quarter report and, for annual filers, the annual report, so a site that rotated staff tends to keep August and lose the other three.
Has Missouri Adopted the Hazardous Waste Generator Improvements Rule, and Is Missouri Authorized for It?
Adopted yes, authorized no, on EPA’s adoption tracker last updated October 8, 2026 (EPA, Where Is the Generator Improvements Rule in Effect?). Missouri’s generator rules carry the 2016 rule’s structure, including very small quantity generator terminology and the 40 CFR 262.18(d) re-notification duty phased in from 2025 under 10 CSR 25-12.010(1)(B). EPA cannot enforce those provisions federally in Missouri.
Those two words are not interchangeable. Adopted means Missouri wrote the 2016 provisions into state law, so a Missouri generator is bound by them as a matter of state law today. Authorized means EPA approved those provisions into Missouri’s federally enforceable program. Missouri has the first and not the second, so the federally enforceable baseline remains the earlier program and EPA cannot cite the newer generator provisions there even though the state can.
Missouri’s base program authorization took effect December 4, 1985 at 50 FR 47740, with revisions authorized in later notices including 2006 and 2012 (77 FR, October 26, 2012). That notice also records a Missouri-only item for a generator checklist: Missouri requires generators to list state waste codes MH01 or MH02, which EPA recognized as more stringent than federal and part of the authorized program.
The cross-border case is where this gets expensive. Kansas has not adopted the Generator Improvements Rule at all. Missouri adopted it without federal authorization. The federal rule EPA enforces is a third thing. We cover the federal framework and the Kansas side in our post on generator categories.
When Is the Missouri Air Emissions Annual Report Due?
April 1 for a paper filing, or May 1 if submitted through the Missouri Emissions Inventory System (MoEIS), covering the previous calendar year, under 10 CSR 10-6.110 and MDNR, Air Emissions Annual Reporting. The emission fee and base fee are separately due June 1. Electronic filing buys a full extra month.
Air is the one Missouri program that runs on the calendar year. The split between report date and fee date catches people: Kansas collapses the inventory and the fee into a single April 1 submission, while Missouri leaves the fee until June 1 (MDNR, Air Emission Fees). A facility that treats the April filing as closing the air file has a payment due sixty days later with nothing on the calendar to catch it.
Which form is due changes by permit tier. Part 70 installations file a Full Emissions Report every year. Intermediate installations file a Full report every third year, on a 2020, 2023, 2026 cadence with the next in 2029, and a Reduced Reporting Form otherwise unless emissions change by five tons or more, which forces a Full report. Smaller sources file a Reduced Reporting Form in most years after an initial Full report (10 CSR 10-6.110 Table 4). Unit-level thresholds are low: 1 ton (2,000 pounds) for sulfur dioxide and nitrogen oxides, 0.438 ton (876 pounds) for volatile organic compounds. April 1 also carries a second function, because written notice to MDNR by that date is what avoids the emission fee for a year with no production or on going out of business.
How Much Is Missouri’s Air Emission Fee per Ton?
$58 per ton for calendar year 2025 emissions, $60 per ton for 2026, and $62 per ton for 2027 and beyond, on MDNR, Air Emission Fees. The fee applies to the first 4,000 tons of each fee-subject pollutant, and no installation pays on total emissions above 12,000 tons in a reporting year (10 CSR 10-6.110).
That escalator was adopted by the Missouri Air Conservation Commission on October 24, 2024 and took effect January 1, 2026. Fee-subject pollutants are sulfur dioxide, nitrogen oxides, volatile organic compounds, primary PM10, hazardous air pollutants, and lead; ammonia, carbon monoxide, PM2.5, and hazardous air pollutants already reported as PM10 or VOC are not (Table 2). An installation emitting less than one ton of all fee-subject pollutants combined still pays for one ton, and sources producing charcoal from wood are excluded entirely.
A tiered base fee is charged on top of the per-ton amount, and this is one place we are not handing you a number. The $50 to $2,500 base fee range, and the operating permit filing fees of $1,250 to $2,000 by emission unit count with complexity fees capped at $6,500, come from the proposed version of a consolidated air fee rule, 10 CSR 10-6.025 (Missouri Register Vol. 50 No. 24, December 15, 2025; MDNR notice). The rule now appears in the current Code of State Regulations chapter table of contents, but the Order of Rulemaking fixing its effective date and the adopted per-tier base fee table could not be read from the Secretary of State’s register in this research pass. Treat those amounts as unconfirmed and call MDNR’s Air Pollution Control Program at 573-751-4817 before a base fee goes into a budget.
Construction permit fees are a separate schedule from the emission fee; we break those out in our post on Missouri’s 2026 construction permit fees. MDNR’s authority to adjust fees and reported data runs under a three-year statute of limitations, with no limit for willful failure to report or fraudulent representation.
What Is a Missouri Intermediate Operating Permit?
A Missouri-only air permit tier at 10 CSR 10-6.065(2)(O), for a Part 70 installation that accepts federally enforceable limits on production or emissions in order to stay under major source thresholds of 100 tons per year of any regulated pollutant and 10 tons per year of any single hazardous air pollutant. The term is five years (MDNR, Air Intermediate Operating Permit).
Missouri runs three air permit tiers: Part 70 (Title V), intermediate, and basic state operating permits. Kansas has an analogous middle tier called Class II, but the mechanics differ, because Kansas Class II sources file the emissions inventory annually while a Missouri intermediate installation files a Full Emissions Report every third year. Renewal timing has a ceiling as well as a floor for both Part 70 and intermediate installations: a complete application is due at least 6 months before expiration and in no event more than 18 months before (10 CSR 10-6.065(5)(B)1.A.(III), (4)(B)1.A.(II)).
Does Missouri Charge a State Fee for TRI Form R?
No Missouri Form R fee appears in any state primary source located for this calendar. Form R goes to EPA through TRI-MEweb by July 1, and MDNR receives the data through EPA’s Central Data Exchange (MERC, How to Comply with EPCRA). Kansas is the contrast: K.A.R. 28-65-4(b) charges a state Form R fee of $250 to $3,000 on the identical filing.
In Missouri the July 1 federal submission is the whole obligation, with no second state envelope. The Kansas pattern does not travel east: a calendar copied from a Kansas facility carries a Form R fee line that does not exist here and misses the Missouri tonnage fees that do.
Does Missouri Require Tier II Reporting for Explosives Below the Federal 10,000 Pound Threshold?
Yes. Missouri requires reporting of 100 pounds or more of explosives or blasting agents, a threshold with no federal EPCRA 312 equivalent (section 292.606, RSMo; MERC, How to Comply with EPCRA). The fire department must be notified within 24 hours of the material being on site, and if storage runs longer than 15 days, the LEPC and MERC must get a Missouri Tier Two form (MERC Tier Two Instructions).
A 24-hour obligation lives in a receiving procedure, not on an annual calendar. Quarry operations, demolition contractors, and any site taking delivery of blasting agents need that notification written into materials receipt. The 15-day line is the second trigger: material consumed inside two weeks generates the fire department notice and nothing more, while material that sits generates a Tier Two form to the LEPC and MERC on top of it. Track the on-site date, not just the quantity.
What Is the Civil Penalty for a Missouri Environmental Reporting Violation?
$10,000 per day across all three Missouri programs: section 260.425.1, RSMo for hazardous waste, section 643.151.3 for air, and section 644.076.1 for clean water. Knowing hazardous waste violations carry criminal fines of $2,500 to $25,000 for each day of violation on a first conviction, rising to $5,000 to $50,000 per day on repeats.
Section 260.425.3 adds up to a year in county jail on a first conviction and imprisonment of not less than ten years on repeats. Section 644.076 mirrors that for water and adds a distinct offense for false statements, falsified records, or tampered monitoring equipment, at up to $10,000 and six months. The air penalty is not assessed where an administrative penalty was already imposed under section 643.085.
Those are ceilings, and reaching one requires an enforcement action and discretion. The consequences that actually land require neither. They attach on a date:
| Missed Deadline | Automatic Consequence |
|---|---|
| Generator registration renewal fee, past the billed due date | Registration administratively inactivated; reactivation requires the fee plus a 15 percent late fee plus an updated registration form (10 CSR 25-12.010(2)(D)-(F)) |
| In-state or out-of-state waste fee, past January 1 | 15 percent late fee on the total original fee (10 CSR 25-12.010(5)(B), (5)(E)) |
| Land disposal fee, past January 1 | 15 percent late fee plus 10 percent annual interest (10 CSR 25-12.010(5)(C)) |
| Commercial TSD inspection fee, past January 1 | 15 percent penalty plus 12 percent annual interest (10 CSR 25-12.020(3)) |
| Tier II fee, past March 1 | 10 percent of the total owed plus 1 percent per month (section 292.606, RSMo) |
| Failure to file a required state hazardous waste report | Registration may be inactivated (10 CSR 25-12.010(3)(H)) |
Inactivation has no Kansas equivalent. Kansas charges escalating per-tank and per-day late fees; Missouri turns the registration off. One thing we will not tell you is how often Missouri enforces reporting-only violations, because no Missouri enforcement statistics or published MDNR enforcement log for reporting violations could be located from a primary source.
Water Permits, Tanks, and Stormwater: The Missouri Dates That Float
Water operating permit annual fees are pegged to the permit anniversary, not a calendar date. A site-specific industrial stormwater permit costs $1,800 a year under a 1 MGD design flow and $2,800 at 1 MGD or more; a general permit for other process or stormwater discharge costs $200; a permit by rule costs $150. The first annual fee goes in with the original application, fees may not be prorated, and the rule states that not receiving a billing statement does not excuse nonpayment (10 CSR 20-6.011(1)(E)-(F), (2), (3)(A)).
Missouri industrial stormwater runs on Missouri’s own master general permits in the MO-R series, not EPA’s Multi-Sector General Permit, because Missouri has held NPDES general permit authority since December 12, 1985 (EPA, NPDES State Program Authority; MDNR, Wastewater Permits). Each master permit has its own expiration, and three fall inside the planning horizon: MO-R23D000 for plastics and rubber manufacturing on May 9, 2027 with renewal in process, MO-R80C000 for motor freight on November 30, 2027, and MO-R80F000 for airports on November 27, 2027. Which permit applies by sector is covered in our industrial stormwater post. One authorization difference matters for anyone discharging to a publicly owned treatment works: Missouri is authorized for NPDES pretreatment, effective June 3, 1981, and Kansas is not, so the control authority chain for a Missouri industrial user sits inside the state program rather than with EPA Region 7.
Underground storage tanks are a one-time charge in Missouri. Registration is $75 per tank, paid once, on a Certificate of Registration that runs five years, and the triggers are what matter: register within 30 days of putting a tank into operation, and file an updated registration within 30 days of an ownership change (10 CSR 26-2.022). EPA granted final approval of Missouri’s UST program revisions and codification in 2024 (Federal Register, May 17, 2024).
Missouri is a federal OSHA state, so Form 300A posting, the electronic submission date, and every other recordkeeping interval are the federal dates with no state overlay and no state portal (OSHA, State Plans).
What Missouri Did Not Do
The easy frame says states keep piling layers on federal rules. For Missouri that frame is wrong in four places.
Missouri deleted a report and kept every fee. Removing state hazardous waste reporting for most generators from the July 2025 to June 2026 reporting year is a genuine reduction in paperwork (MDNR, Hazardous Waste Reporting). The registration renewal fee, the in-state waste fee, the land disposal fee, the transportation fee, and the landfill tax all survived it. In Missouri the fees are the state layer, and the paperwork is not.
Missouri charges nothing for Form R, so a program built on the Kansas model carries a state fee line that does not exist here.
Missouri’s tank program is cheaper and has no recurring per-tank date. Kansas charges per tank every April 30 with late penalties, plus a separate aboveground tank fee every December 31. Missouri charges $75 per tank once. Any post implying an annual Missouri tank fee is wrong.
And Missouri’s air fee escalator has an expiration date in statute. Section 643.079, RSMo sets the Commission’s fee-revision authority to expire August 28, 2030, and provides that if the authority lapses, the fee structure in place at that time remains in effect. A facility budgeting past 2030 should flag that date, because it is where the published $62 per ton schedule stops looking forward.
Four Items We Are Flagging Rather Than Stating
First, the statutory band on the air emission fee. Section 643.079, RSMo as displayed on the Revisor’s site directs the Commission to set the fee at a minimum of $25 and no more than $40 per ton, while the operative rule charges $58, $60, and $62 (section 643.079, RSMo; MDNR, Air Emission Fees). Which subsection or later amendment authorizes the higher rates could not be confirmed from the Revisor page in this pass. We are not telling you Missouri charges above a statutory cap, because we do not know that. What we can say is that the per-ton fee has risen well above the band in the fee-setting subsection as displayed, that the fee-revision authority sunsets August 28, 2030, and that both facts belong in a long-range air budget.
Second, the adopted base fee table under 10 CSR 10-6.025, covered above. The amounts in circulation come from the proposed rule, and the adopted table was not retrievable. Confirm with MDNR before using one.
Third, the water fee amounts. 10 CSR 20-6.011(2)(C) charges $1,800 and $2,800 for site-specific industrial stormwater permits while section 644.052, RSMo as displayed lists $1,350 and $2,350. The statute page notes a later version that may differ from the text displayed, so this is a display question rather than an overcharge, and the rule amount is the one to pay. MDNR also convened a workgroup in 2025 to review the water fee structure, with no proposed amounts published (MDNR, Water-Related Fees). Treat the current amounts as operative and under review.
Fourth, source verification on three rules. The text behind the air report due dates, the intermediate permit definition, the renewal window, and the water fee amounts was read on a Code of State Regulations mirror rather than the Secretary of State’s official chapter files, which are large and could not be paged to the relevant rule in this pass. Those rules are 10 CSR 10-6.110, 10 CSR 10-6.065, and 10 CSR 20-6.011. Confirm against the official chapter text or with MDNR before a filing or payment depends on one.
One note on guidance documents. MERC’s own Tier Two Instructions PDF still carries an outdated federal penalty figure and points to a retired web address, while the live filing site is apps1.mo.gov/MERC. Use the statute and the live portal for every current number. We did not take a penalty figure from that document, and neither should anyone else.
Building a Missouri Compliance Calendar That Holds
Every item here traces to the same structural facts. Missouri runs hazardous waste reporting and fees on a July to June year while the federal program runs on the calendar year. It charges for hazardous waste by the ton, with payment due January 1 on a bill issued December 1. It sends Tier II to the Department of Public Safety rather than the environmental agency. It splits the air report date from the air fee date by sixty days. And it enforces the money side by turning registrations off rather than by assessing per-day penalties. None of that appears on a federal calendar, and a generic multi-state list tends to flatten all of it into one state fee line.
iSi Environmental’s compliance program management tracks this Missouri layer alongside the federal calendar, so MoGEM, MoRCRA, MoEIS, and the MERC portal get the same attention as RCRAInfo and EPA’s systems. If you do not know today whether your MoRCRA site page still shows a report button, whose name is on the MDNR renewal bill arriving in December, or which twelve months of tonnage your January invoice was calculated from, those are the three things to check first. If you would rather hand the calendar off, talk to our environmental compliance group.
Sources
- EPA, Where Is the Hazardous Waste Generator Improvements Rule in Effect?
- EPA, NPDES State Program Authority
- OSHA, State Plans
- 91 FR 9457, Air Plan Approval; Missouri; Reporting Emission Data, Emission Fees, and Process Information, February 26, 2026
- 77 FR, Missouri: Final Authorization of State Hazardous Waste Management Program Revisions, October 26, 2012
- 71 FR 25079, Missouri: Final Authorization of State Hazardous Waste Management Program Revisions, April 28, 2006
- Federal Register, May 17, 2024, Missouri: Final Approval of State Underground Storage Tank Program Revisions, Codification, and Incorporation by Reference
- 10 CSR 25-12, Hazardous Waste Fees and Taxes and Compliance Inspection Fees, current CSR text
- 10 CSR 26-2, Underground Storage Tanks, current CSR text
- 10 CSR 10-6, Air Quality Standards and Air Pollution Control Regulations, current chapter text
- Missouri Register Vol. 50 No. 24, December 15, 2025, proposed new rule 10 CSR 10-6.025 Fees
- Missouri Register Vol. 51 No. 11, June 1, 2026, Orders of Rulemaking issue
- 10 CSR 25-12.010, Fees and Taxes, full rule text on the Code of State Regulations mirror
- 10 CSR 10-6.110, Reporting Emission Data, Emission Fees, and Process Information, full rule text on the Code of State Regulations mirror
- 10 CSR 10-6.065, Operating Permits, full rule text on the Code of State Regulations mirror
- 10 CSR 20-6.011, Fees (Clean Water Commission), full rule text on the Code of State Regulations mirror
- Section 260.425, RSMo, hazardous waste violations, civil and criminal penalties
- Section 292.605, RSMo, hazardous substance information, Tier II recipients and update duty
- Section 292.606, RSMo, Tier II fees, caps, exemptions, late charges, and March 1 due date
- Section 643.079, RSMo, air emission fees, per-ton band, tonnage caps, and August 28, 2030 sunset
- Section 643.151, RSMo, Air Conservation Law civil penalty
- Section 644.052, RSMo, water operating permit fees
- Section 644.076, RSMo, Clean Water Law unlawful acts and penalties
- MDNR, Hazardous Waste Reporting
- MDNR, Hazardous Waste Fees
- MDNR, Air Emissions Annual Reporting
- MDNR, Air Emission Fees
- MDNR, Missouri Emissions Inventory System (MoEIS)
- MDNR, Air Intermediate Operating Permit
- MDNR, 10 CSR 10-6.025 Fees, New Proposed Rule, Public Comment Period December 15, 2025 to February 5, 2026
- MDNR, Wastewater Permits, MO-R master general permit list with expiration dates
- MDNR, Site-Specific Industrial Stormwater Operating Permit
- MDNR, Water-Related Fees
- MDNR, Missouri Gateway for Environmental Management (MoGEM)
- MDNR, Missouri RCRA (MoRCRA) Data System
- MERC Tier II filing site, apps1.mo.gov/MERC
- MERC, Fee Calculation Worksheet Instructions
- MERC, How to Comply with the Missouri Hazardous Substance Emergency Response Act and EPCRA